Laserfiche WebLink
<br />('.J <br />c::> <br />C') <br />,~-i <br />'L_) <br />C) <br /> <br />tion of water from the Pletero outlet gates to <br />the headgates. 'rho responsibility for sdministrs- <br /> <br />tion of the water between the outlet gates and. the <br /> <br />points of diversion is placed upon the state Bngineer <br />by the Coloredo wator law. The District connet as- <br />sume such responsibility. <br />4. Tl~ irrigation operational plan of the <br />Platoro Reservoir has always contemplated that the <br />ownors of direct flow righta will forego the use of <br /> <br />s portion of those rights during periods of high <br />flow and in sccordancc with. definits formula, per- <br />mit the .torage of the water covered thereby in <br />Platoro Reservoir for release and uae during low <br />\'later periods. The spplic"tion as subm1tted does <br />not effectively osrry out such pl.an. <br />5. Both the r.solution and the appliostion <br />impose upon the District tho responsibility for ss- <br />suring compliance with the excess lsnd prov1sions <br /> <br />of the Federal P.eclBme-t1on Laws'. Since its organiz.o- <br /> <br />tion, the District hss repeatedly sdvised the Bureau <br /> <br />thnt unless there 1s a roodiricotion of suoh excess <br /> <br />land provisions to recognize the condltions exist- <br /> <br />ioe: on the Conejos, the necessary water-use contracts <br /> <br />cannot be obtained from. the f~rm6rs'. <br /> <br />Upon completion of tbe discussion, on the motion of Mr. <br /> <br />Reed, seconded by Mr. Shawcroft, and unanimously corried, the <br /> <br />resolution end app11c~tlon subnitted by tl~ Eureau of Reclams- <br /> <br />- 5 - <br /> <br />.,,~ <br />