Laserfiche WebLink
<br /> <br />. <br /> <br />;}t.~ <br /> <br />'@i~~) <br /> <br />",.' . . . . <br />.t <br />,; <br /> <br />O r;~' 0 (-. .1 <br />U.G I... 0..; , <br /> <br />navigation. l)ecause of the vel'~' 211[;,t cost of such a sy;:;'~e;li i'.; obvlously <br /> <br /> <br />wou1.d not be prudent use of public funds to make such; an instaJ.J.ation before <br /> <br /> <br />it is actually needed. A special study of such a future development recently <br /> <br /> <br />has been authorized by Congress. <br /> <br /> <br />The power generation capacity which is presently instaJ.J.ed in the main <br /> <br /> <br />stem system is 985,000 kilO1ffittS. By the time the last pmrer units at Oalte <br /> <br /> <br />and Big Bend come on the line in 1966, the total power instaJ.J.ation ,/ill reach <br /> <br /> <br />2,0!~8,OOO kilo,Tatts. This represents a substantial increase over the originaJ. <br /> <br /> <br />proposal by the Corps of Engineers in House Document 475 for 1,100,000 kilo- <br /> <br /> <br />watts, and over the ol"iginaJ. proposal by the Bureau of Reclamation in Senate <br /> <br /> <br />Document 191 for less than 500,000 kilowatts. Thus the Federal hydro installa- <br /> <br /> <br />tion on the Missouri River will serve to ca:rry fa:r greater preference power <br /> <br /> <br />loads than were originally visualized. <br /> <br /> <br />In summery, this mid-year review shows that as construction progress con- <br /> <br /> <br />tinues on the comprehensive Basin program, COmpleted projects are being im- <br /> <br /> <br />mediately placed in public service so that the people now living in the Basin, <br /> <br /> <br />as well as future generations, can enjoy the fruits of these developments. <br /> <br /> <br />Actual e:x;perience in the Missouri River Basin is a sound testimonial to <br /> <br /> <br />the value of development of comprehensive multiple-puxpose programs for this <br /> <br /> <br />and other river basin areas. The Flood Control Act of 1944 prOvided a sound <br /> <br /> <br />basic framel0f0rk with flexibility to add neH developments as public needs arise. <br /> <br /> <br />The Federal and State agencies have demonstrated their capability to provide <br /> <br /> <br />the cooperation and coordination essential to sound planning and construction <br /> <br /> <br />and, equaJ.ly important, the controls needed to insure the best and most equit- <br /> <br /> <br />able use of these controlled natural resources in the public interest of the <br /> <br /> <br />entire Basin. <br /> <br />7 <br /> <br /> <br />: :';;'~/.'" <br />>.~<~~: <br />.... --~ <br />'~"'...: -'-.~' <br />i?5~~ <br /> <br />I <br /> <br />>}-~-< <br />:;.: ", <br />C/.~:Z~ <br /> <br />;~~,~;1 <br />~i,.:~ <br /> <br />~,Y~~:::r- <br />'-.-.."'. <br /> <br />fl~i1~ <br /> <br />....~~..; :::~:;". <br /> <br />~~~~ <br /> <br />~g~ <br /> <br />~::\:~~*; <br /> <br />."-' "'-'"-. <br />1...:.;--:::-: <br />;~tf::~:' <br /> <br />: ,~'';:'--~'~ <br />;,--~.-,::",. . <br /> <br />- ", :":-::. ~ <br /> <br />',';. <br />