Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. <br /> <br />DOMINGUEZ RESERVOIR PROJECT <br /> <br />March 12, 1980 <br /> <br />Schedule <br /> <br />Changes Since March 1979 <br /> <br />Feasibility Report <br />Draft Environmental Statement <br />Public Hearing <br />Final Environmental Statement <br /> <br />March 1979 <br />Fall 1980 <br />Fall 1980 <br />Winter 1981 <br />Spring 1981 <br /> <br />The 1978 Appraisal Cost Estimate was $330 million. <br /> <br />The 1978 benefit-cost ratio was 1.1:1. <br /> <br />Current <br />mid-calendar year 1981 <br />late calendar year 1981 <br />late calendar year 1981 <br />mid-calendar year 1982 <br /> <br />Because of its large workload, Water and Power's Engineering and Research <br />Center in Denver has not been able to begin preparing feasibility designs of <br />Rim Basin Dam, Reservoir, and Pumping-Powerplant. At the time of this print- <br />ing, an Architect-Engineer contract is being negotiated for the Rim Basin <br />designs. <br /> <br />36 <br />