My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09790
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09790
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:55:51 PM
Creation date
10/12/2006 3:55:37 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.100.70
Description
CRSP
Basin
Colorado Mainstem
Date
3/12/1980
Author
CWCB/WPRS
Title
Annual Planning, Construction and Operating Projects Review, West Slope Projects, Colorado
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
67
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />. <br /> <br />DOMINGUEZ RESERVOIR PROJECT <br /> <br />March 12, 1980 <br /> <br />Schedule <br /> <br />Changes Since March 1979 <br /> <br />Feasibility Report <br />Draft Environmental Statement <br />Public Hearing <br />Final Environmental Statement <br /> <br />March 1979 <br />Fall 1980 <br />Fall 1980 <br />Winter 1981 <br />Spring 1981 <br /> <br />The 1978 Appraisal Cost Estimate was $330 million. <br /> <br />The 1978 benefit-cost ratio was 1.1:1. <br /> <br />Current <br />mid-calendar year 1981 <br />late calendar year 1981 <br />late calendar year 1981 <br />mid-calendar year 1982 <br /> <br />Because of its large workload, Water and Power's Engineering and Research <br />Center in Denver has not been able to begin preparing feasibility designs of <br />Rim Basin Dam, Reservoir, and Pumping-Powerplant. At the time of this print- <br />ing, an Architect-Engineer contract is being negotiated for the Rim Basin <br />designs. <br /> <br />36 <br />
The URL can be used to link to this page
Your browser does not support the video tag.