My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09779
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09779
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:55:47 PM
Creation date
10/12/2006 3:55:23 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500.10
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects- Aquatrain
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
10/1/1983
Title
Monthly Progress Report - Aquatrain Project - October 1983
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />~ <br /> <br />~') <br /> <br />-',j1 <br />11",,1 <br /> <br />f.) <br /> <br />Complete Work Order #2 to BLM/Reclamation Interagency Agreement <br />and submit to BLM, Division of EIS Services. Work Order #2 <br />will define the scope of work and funding level for preparation <br />of the Project EIS. <br /> <br />'.~. ") <br /> <br />Submit Final Corridor Study comments from Forest Service <br />Region 4 to Oivision of EIS Services for inclusion in the <br />report. <br /> <br />Receive "review to print" copy of Corridor Study from Division <br />of EIS Services. <br /> <br />Field trip to Price-Ephraim area in Utah to evaluate a corridor <br />alternative suggested by local interests. <br /> <br />6.3 ANTICIPATED DECEMBER EVENTS <br /> <br />Begin work on Project Oescription for the EIS. <br />Print Corridor Study Report and distribute. <br />Define required energy management studies for the EIS. <br /> <br />Begin defining required permits for the Project. <br />State, and local permit application will parallel <br />to the degree possible. <br /> <br />Federa 1, <br />EIS preparation <br /> <br />7.0 SUBTEAM: PLANNING COORDINATION/REPORTS/PUBLIC INVOLVEMENT <br />( Stefanec) <br /> <br />7.1 OCTOBER EVENTS <br /> <br />Briefed elected officials of City of North Las Vegas, Nevada. <br />The meeting was cordial and beneficial. Briefed Henderson, <br />Nevada's Chamber of Commerce General Membership Meeting. <br />Also, briefed Nellis Air Force Base Command representatives, <br />who continue to be receptive and supportive of the Project. <br />The officials expressed a preference that alignments not <br />cross the Base near ordnance storage areas. They suggested <br />a route alternative which will be explored. <br /> <br />Continued coordination with Utah local governments to schedule <br />advance work in November. <br /> <br />Work progressed on updating and revising PROPLAN to reflect <br />Project status. <br /> <br />An updated Briefing Packet will be printed early in the <br />new calendar year. <br /> <br />Revised AQUATRAIN slideshow for internal review. <br />Coded and categorized AQUATRAIN mailing list. <br /> <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.