Laserfiche WebLink
<br />,\ .. t. <br />Il-j \oJ ~..\. <br /> <br />Homestake water will be routed to the Homestake delivery system. <br /> <br />The Homestake Project will import an average of 62,900 acre-feet <br /> <br />annually when fully developed. <br /> <br />High Line Canal Company and the Board of Hater \~orks of Pueblo own <br /> <br />and operate the Busk-Ivanhoe system transmountain diversion system. <br /> <br />Water is now diverted from upper Ivanhoe Creek via Carlton Tunnel, <br /> <br />an abandoned railway tunnel, to Busk Creek and on to Turquoise <br /> <br />Lake. Service-type contracts have been executed with High Line <br /> <br />Canal Company and the Board of Water Works which provide for <br /> <br />carriage of their western slope water through Project faciliti.es <br /> <br />on an "if-and-when" available basis. The Hi gh Line Canal Cor.:pa',,,y' s <br /> <br />contract further providGs for storage of SUCh trarrsmount~in ~~~er <br /> <br />in Project stornge facilities on an "if-and-,.,hen" ....vaiL,',le basis. <br /> <br />Busk-Ivanhoe water 'i.1"il1 be routed through Praject pc.werpla~ts :[')1' <br /> <br />power generation. The quomtity uf w....ter imported for the Comnany <br /> <br />nnd the Board of Water Works will averace about 6,900 acre-feet <br /> <br />annually. <br /> <br />T~lin L.:1kes Tunnel, n trnnsmou.ntain water di~lGrsion i)roject, clive;. =s <br /> <br />water from the headwaters 0f the Roaring Fork River to Lake Creek <br /> <br />above Twin Lakes. Hater diversions w; 11 be rep;u1[ltp.d in "win L~:{28 <br /> <br />,md routed through the Otero POlerplant for power generation. 7win <br /> <br />Lakes Reservoir and Canal Company imports an averace of 50,500 <br /> <br />acre-feet annually. <br /> <br />18 <br />