Laserfiche WebLink
<br />. the design criteria for the various components of the facility, and <br /> <br />· an opinion of probable costs for a two-phase development of the facility. <br /> <br />Section 3.0 of this summary report describes the results of the Fish Pro conceptual design <br />analysis as updated by discussions with CDOW staff and FishPro and Leonard Rice <br />Consulting Water Engineers consulting staffs. <br /> <br />2-5 <br />