My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09624
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09624
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:54:50 PM
Creation date
10/12/2006 3:45:36 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8543.800
Description
Closed Basin Division - Water Sales/Contracts
State
CO
Basin
Rio Grande
Water Division
3
Date
9/30/1982
Title
Agenda Item 12 a - October 7 1982 Board Meeting -- Closed Basin Project Enhancement Plan
Water Supply Pro - Doc Type
Board Memo
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />C'.j <br />~ <br />.".~ <br />~ <br /> <br />'...) <br /> <br />:.. <br />'--.' <br /> <br />. <br /> <br />. <br /> <br />TABLE 2 <br />WATER SUPPLY FACILITIES <br />HEAD UKI, - SAN LUIS UKt: <br />(October 1982 Estimates) <br /> <br />Pipeline System to Head l,ake <br /> <br />. ~, <br /> <br />Collection system from wells to conveyance channel _ <br />. includes 5,800 feet of lD-inch pipe with 2 cubic feet <br />"per second (ft3/s) capacity; 4,500 feet of 15-inch pipe with <br />4 ft3/s capacity; and 1,400 feet of l8-inch pipe with <br />6 ft3/s capacity <br /> <br />Conveyance pipeline to Head Lake - 4,000 feet of <br />l8-inch pipe with 6 ft3/s capacity and inlet structure <br />Subtotal: <br /> <br />Pipeline Lateral to San Luis 'Lake <br /> <br />Conveyance pipeline from wells east. of San Luis Lake <br />. consists of 3,300 feet of 15-1nch pipe with 4 ft3/s <br />. capacity and inlet structure <br /> <br />Water Level Re~ulatinR Structure <br /> <br />Structure consists of a flow through system to allow <br />water surface in San Luis Lake not to exceed elevation <br />of 7,521.5 mean sea level <br /> <br />San Luis Lake Pumpinst Plant <br /> <br />Plant contains three electric pumps with a combined <br />capacity to lift 10 ft3/s from lake to conveyance <br />channel <br /> <br />Electric Transmission 'Line <br /> <br />Energy supply for 10 ft3/s pumping plant - 3-phase <br />power, 12 kilo-volt line <br /> <br />, , Total estimated cost of water supply facilities: <br /> <br />'" <br />, <br /> <br />$195,000 <br /> <br />200,000 <br /> <br />$395,000 <br /> <br />$127,000 <br /> <br />$ 5,000 <br /> <br />$336,000 <br /> <br />$ 88,000 <br /> <br />$951,000, <br /> <br />'., <br /> <br />;' "'." ,; <br /> <br />{\i~~ri <br />I"r "1 .~ . \: . <br />.' .'1 ~.. , I ~."! -. <br />
The URL can be used to link to this page
Your browser does not support the video tag.