Laserfiche WebLink
<br />" <br /> <br />C'.j <br />~ <br />.".~ <br />~ <br /> <br />'...) <br /> <br />:.. <br />'--.' <br /> <br />. <br /> <br />. <br /> <br />TABLE 2 <br />WATER SUPPLY FACILITIES <br />HEAD UKI, - SAN LUIS UKt: <br />(October 1982 Estimates) <br /> <br />Pipeline System to Head l,ake <br /> <br />. ~, <br /> <br />Collection system from wells to conveyance channel _ <br />. includes 5,800 feet of lD-inch pipe with 2 cubic feet <br />"per second (ft3/s) capacity; 4,500 feet of 15-inch pipe with <br />4 ft3/s capacity; and 1,400 feet of l8-inch pipe with <br />6 ft3/s capacity <br /> <br />Conveyance pipeline to Head Lake - 4,000 feet of <br />l8-inch pipe with 6 ft3/s capacity and inlet structure <br />Subtotal: <br /> <br />Pipeline Lateral to San Luis 'Lake <br /> <br />Conveyance pipeline from wells east. of San Luis Lake <br />. consists of 3,300 feet of 15-1nch pipe with 4 ft3/s <br />. capacity and inlet structure <br /> <br />Water Level Re~ulatinR Structure <br /> <br />Structure consists of a flow through system to allow <br />water surface in San Luis Lake not to exceed elevation <br />of 7,521.5 mean sea level <br /> <br />San Luis Lake Pumpinst Plant <br /> <br />Plant contains three electric pumps with a combined <br />capacity to lift 10 ft3/s from lake to conveyance <br />channel <br /> <br />Electric Transmission 'Line <br /> <br />Energy supply for 10 ft3/s pumping plant - 3-phase <br />power, 12 kilo-volt line <br /> <br />, , Total estimated cost of water supply facilities: <br /> <br />'" <br />, <br /> <br />$195,000 <br /> <br />200,000 <br /> <br />$395,000 <br /> <br />$127,000 <br /> <br />$ 5,000 <br /> <br />$336,000 <br /> <br />$ 88,000 <br /> <br />$951,000, <br /> <br />'., <br /> <br />;' "'." ,; <br /> <br />{\i~~ri <br />I"r "1 .~ . \: . <br />.' .'1 ~.. , I ~."! -. <br />