Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />.~ <br />co <br />...... <br />C"? <br />c:-. <br />c' <br /> <br />October 1982 Estimates <br /> <br />Table 1 - Full Development Plan <br />PUBLIC USE FACILITY DEVELOPMENT COSTS <br /> <br />AT <br />SAN LUIS LAKE <br /> <br />Picnic Sites (40 each) <br /> <br />Includes: shelter, fire grate, and table <br />40 each @ $3,600 <br /> <br />$ 144,000 <br /> <br />Campsites (60 each) <br /> <br />Includes: Table, trash container, parking space, <br />camping pacl, and shelter <br />60 each @ $3,700 <br /> <br />222,000 <br /> <br />Boat Ramps (2 each ~ 24'X'200') <br /> <br />Includes: 6-inch concrete over 4-inch gravel, boat dock, <br />240' X SO' parking lot with 6-inch gravel <br />2 each @ $42,000 <br /> <br />84,000 <br /> <br />Fishin~ Access Areas (6 each'~Rrave1) <br /> <br />6 each @ $2,000 <br /> <br />12,000 <br /> <br />Sanitary Facilities (2 each) <br /> <br />Includes: Comfort stations with flush toilets <br />and leaChing field <br />2 each @ $61,000 <br /> <br />122,000 <br /> <br />Trails (2 miles) <br /> <br />2 miles @ $8,500 <br /> <br />17 ,000 <br /> <br />Water System <br />Roads. . Landscapin~, and FencinR <br /> <br />85,000 <br />, 289,000 <br /> <br />Unlisted Items <br /> <br />Contingencies (20+) <br />Field Cost <br />Overhead (35 percent) <br />Total Construction Cost: <br /> <br />97,000 <br />$1,073,000 <br />215.000 <br />$1,288,000 <br />451,000 <br />$1,739.000 <br />