My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09436
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09436
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:53:38 PM
Creation date
10/12/2006 3:38:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8543
Description
Closed Basin Division
State
CO
Basin
Rio Grande
Water Division
3
Date
7/20/1968
Author
Davis Engineering Se
Title
Preliminary Engineering Report for the Rio Grande Water Conservation District
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />~J "'~ <br />~.I ~..:) <br />C I "..j <br /> <br />,,-.I <br />, -:) <br />(~) <br /> <br />y <br /> <br />lino has the responsibility of bringing the situation to a favorable solution? <br />If the natural channels have degraded to the extent that abnormal losses are <br />incurred in transit, who must pay for the loss? If water can not be diverted <br />so that Compact deliveries can be met, who has the responsibility of delivering <br />the water to where it can be counted as credit? Who has the responsibility of <br />checking and inspscting diversionary works to see that they are adequate and <br />suitable for the purpose, are properly maintained and operated and do not <br />adversely affect channel conditions or other users? <br /> <br />, CONCLUSIONS <br /> <br />The District needs immediately sufficient money to complete the Norton Drain <br />Project which is estimated to cost $60,000.00. <br /> <br />The District needs immediately sufficient money to complete the study of <br />channelization of San Antonio River and Rock Creek and preparation of plans <br />and specifications for the work to be done under these projects. The cost <br />of the study and preparation of plans and specifications is estimated to <br />be $7,500.00 for each of the two channelization projects, or a total cost of <br />$15,000.00. <br /> <br />The District also needs funding of sufficient money to carry out long range <br />planning in an amount of not less than $10,000.00 per year for the next several <br />years. <br /> <br />The District should have available to it at such time as plans and specifications <br />are completed funds for construction of the channelization of Rock Creek and San <br />Antonio River. This should be during the irrigation season of 1969. <br /> <br />The District should have available to it money for studying,additional specific <br />water salvage projects, which money should be available to the District not, later <br />than summer of '1969. The amount involved has not yet been estimated, but we will <br />be happy to help the Board come up wi th a specific r.equest, if desired, if the <br />Board determines to make application for financial help from the State Water <br />Conservation Board. Any such specific proposal should be developed in time <br />for consideration for possible inclusion in the State budget which will become <br />effective July 1, 1969. <br /> <br />Respectfully aubmitted, <br /> <br />/~d~ <br /> <br />Engineer for Rio Grande Water C~neer- <br />vation District <br />Colorado Certificate No. 557 <br />
The URL can be used to link to this page
Your browser does not support the video tag.