<br />I Table A3.1 - Summary of Estimated Project Costs (Tipton and Kalmbach 1983, Table 5) <br />I. 2765 <br />Item Description Amount <br />I Rehabilitation of the Fort Lyon Conal Upper Dam <br /> and Heodworks $ 15,800 <br /> 2 Rehabilitation of the Fort Lyon Conal Lower Dam <br />I and Heodworks 100,200 <br />3 Rehabilitation of the Fort Lyon Canol Wasteways 41,300 <br /> 4 Rehabilitation of the Flume across Horse Creek 77,800 <br />I 5 Rehabilitation of Gageby Wasteway 32,500 <br />6 Rehabilitation of Kicking Bird Bifurcation 21,100 <br />7 Construction of Thurston Reservoir Pumping Plant 142,900 <br /> 8 Rehabilitation of Thurston Reservoir 50,900 <br />I 9 Rehabilitation of the Control Basin 5,300 <br />10 Elevation-Capacity Curve for the Control Basin 2,200 <br /> II Rehabilitation of Laterals 50,000 <br />I Subtotal, Rehabilitation of Fort Lyon Canol ~540,000 <br /> 12 Rehabilitation of the Storage Conal Diversion Dam <br />I and Headworks 73,900 <br />13 Rehabilitation of the Storage Conal Wasteways 37,400 <br />14 Rehabilitation of the Holbrook Conal - Fort Lyon <br />il Storage Conal Combined Wasteway 53,300 <br />15 Rehabilitation of the Siphon under the Holbrook Canol 16,300 <br />16 Rehabilitation of the Siphon under Horse Creek 294,200 <br /> 17 Rehabilitation of Horse Creek Reservoir 60,000 <br />:Ie 18 Rehabilitation of Adobe Creek Reservoir 12,100 <br />19 Rehabilitation of the Horse Creek Diversion Works 66,000 <br /> Subtotal, Rehabilitation of the Storage System $613,200 <br />I 20 Construction of the Fort Lyon Canol Upper Dam Sluiceway 88,200 <br />21 Construction of the Fort Lyon Canol Lower Dam Sluiceway 110,100 <br />I 22 Construction of the Storage Conal Diversion Dam <br /> Sluiceway 67,900 <br />23 Construction of the Storage Canal Diversion Dam <br />:1 Regulator 66,700 <br />24 Construction of the Storage Canol Seepage Wasteway 65,200 <br />25 Construction of the Check Structures on the Fort Lyon <br /> Conal 250,000 <br />.1 Subtotal, New Construction I $648,100 <br />26 Conal Bonk Stabilization 50,000 <br />:1 27 Canol Lining 250,000 <br />28 Construction of the 20-foot Parshall Flume on the <br /> Fort Lyon Canal 53,900 <br />I 29 Rehabilitation and Establishment of Gaging Stations 4,300 <br />30 Construction of Weed and Trash Control Devices 100,000 <br />31 Preparation of on Operation and Maintenance Program 30,000 . <br />I Subtotal, Miscellaneous Items $488,200 <br />32 Projected Price Increase 410,500 <br />.. TOTAL ESTIMATED PROJECT COST $2,700,000 <br />I <br />I I Note: m8,300 for new construction On Fort Lyon Canal <br /> 199,800 for new construction on Storage System <br /> A3-2 <br />