My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09401
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09401
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:53:23 PM
Creation date
10/12/2006 3:36:41 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8056
Description
Drought Preparedness
State
CO
Basin
Statewide
Date
8/28/1986
Author
CDM
Title
Phase I - Drought Study - City of Loveland Raw Water Supply System
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
174
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />~~4jC!.1 <br />... .J ._ ... '- <br /> <br />1.0 INTRODUCTION <br /> <br />1.1 BACKGROUND AND PURPOSE <br /> <br />The City of Loveland, Colorado has a complex water supply system with <br />respect to the number of different supply sources from which it may draw <br />water. These sources include direct-flow rights on the Big Thompson River, <br />ownership in a number of private irrigation ditch and reservoir companies, <br />ownership of Colorado Big Thompson Project (CBT) units and ownership of <br />Vindy Gap Project (VGP) units. <br /> <br />The Loveland Vater Board has been engaged in planning activities to meet <br /> <br />future water needs and to effectively manage the existing and future water <br /> <br />resources of the City. Earlier master plan studies (1971 and 1974) for the <br /> <br />City's water needs did not include an in-depth analysis of drought <br /> <br />potential or of alternatives to mitigate drought impacts but did recommend <br /> <br />annual purchases of additional water rights to meet future demands. Past <br /> <br />studies, however, do not provide sufficient information to answer questions <br /> <br />concerning the City's ability to provide a reliable supply of water for <br /> <br />various combinations of projected demand and water rights acquisitions. <br /> <br />Negotiations were concluded in Colorado Vater Court in 1985 concerning the <br /> <br />"Transfer Decree" (Vater Case Number 82-CV-202A) which allows Loveland to <br /> <br /> <br />divert a portion (based on shares owned) of river water irrigation <br /> <br />withdrawals by certain ditches directly to 1) the Vater Treatment Plant, 2) <br /> <br />the Dille Tunnel Inlet, and/or 3) the City's Green Ridge Glade reservoir. <br /> <br />The Transfer Decree imposed several constraints, however, on the timing of <br /> <br />withdrawals and the quantities that may be taken. These constraints were <br /> <br />included in the evaluations of system yield and reliability performed in <br /> <br />this study. <br /> <br />In 1985 the Vater Board recommended that the City evaluate the need for <br /> <br /> <br />increased reservoir capacity to meet future needs. In November of 1985, <br /> <br />1-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.