My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09396
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09396
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:53:21 PM
Creation date
10/12/2006 3:36:31 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8276.500
Description
Glenwood-Dotsero Springs Unit - Salinity Control Projects
State
CO
Basin
Colorado Mainstem
Water Division
5
Date
3/1/1986
Title
Salt Tolerant Emergent Plant Process Status Report
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />. <br /> <br />l!') <br />go <br />co <br /> <br />( j <br />c:) <br />~:; <br /> <br />agreement to pay unit cost per ton of salt disposed of during commercial <br />facility operation. <br />phase IV consists of design, construction, and operation of a full- <br /> <br />scale production facility located at palisade. The time requirement for <br /> <br /> <br />this phase would be 1.5 years to bring the facilities to full operation, <br /> <br /> <br />and the cost is estimated at $135,000,000. <br /> <br />Cost effectiveness of the proposed plan, based on 1985 construction <br />costs, is estimated at $57 per ton. Salt reduction to the Colorado River <br />would be about 310,000 tons per year, based on removal of the enti re flow <br /> <br />of Glenwood Springs saline water of 16.9 cfs (12,200 acre-feet per year). <br />Since presentation of the four-phase development plan in January <br />1986, IBR has provided additional information on work necessary to fur- <br />ther develop the STEP process. In a March 4, 1986, letter to the Univer- <br />sity of Arizona Environmental Research Laboratory, IBR identified an <br /> <br />aquaculture development as an example of a potential beneficial use for <br /> <br /> <br />the Glenwood Springs saline water. The letter further identified a near- <br /> <br />term development plan consisting of five tasks necessary to help minimize <br /> <br />technical risk, verify compatibility of the available resources with po- <br /> <br />tential beneficial uses, and provide a sound basis for continuation. The <br /> <br />five tasks included in the near-term development plan are: <br /> <br />1. Analyze, select, and deterndne operating parameters <br />for salt tolerant plant species. This task would <br />require 49 man-days over a 14-week period at an es- <br />timated cost of $30,900. <br /> <br />2. verify plant growth and productivity at a quarter- <br />acre test plot near Glenwood Springs. An estimated <br />120 man-days would be required for this task at a <br />total cost of $84,520. <br /> <br />3. Estimate costs of STEP pond operations at the demon- <br />stration facility. Time required for this task <br />would be 15 man-days over a 5-week period. The cost <br />is estimated at $9,000. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.