<br />rf ' <br /> <br />I. <br /> <br />During Phase I, Stage B construction, Dry Side Canal, Long Hollow Tunnel, the Southern Ute <br />Diversion Dam, and a portion of the Southern Ute Inlet Canal would be sized to accommodate <br />future capacities needed for Phase n water deliveries. <br /> <br />Ridges Basin Pumping Plant and its appurtenant structures would also be designed and constructed <br />with capacity to accommodate future Phase n water deliveries. However, only the number of <br />pumps needed to meet the required Phase I, Stage B capacity (600 cfs) would be installed. In <br />Durango Pumping Plant, which would be constructed in Phase I, Stage A, additional pumps would <br />be installed to meet Phase I, Stage B water supply needs. The required pumping capacities at <br />Durango Pumping Plant for Phase I, Stage B and Phase n are the same (480 cfs at full reservoir). <br /> <br />Southern Ute Diversion Dam, a portion of Southern Ute Inlet Canal, and the Southern Ute Interim <br />Irrigation Canal would be constructed to service irrigated land in New Mexico because Southern <br />Ute Reservoir and the New Mexico Irrigation Canal would not be constructed until Phase n. <br /> <br />28 <br />