My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09393
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09393
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:53:20 PM
Creation date
10/12/2006 3:36:26 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8143.700
Description
John Martin Reservoir - Annual Operating Plans and Reports
State
CO
Basin
Arkansas
Water Division
2
Date
12/1/1999
Title
Annual Report of the Operations Secretary - Concerning the Operation of John Martin Reservoir - 1999 -- Part 1 of 2
Water Supply Pro - Doc Type
Annual Report
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
59
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />c. <br />0"'"\ <br />tV <br />.... <br />-..:! <br />I-" <br /> <br />STATE OF COLORADO <br /> <br /> <br />WATER DIVISION 2 <br />OFFICE OF THE STATE ENGINEER <br /> <br />310 East Abriendo, Suite B <br />Pueblo, Colorado B 1 004 <br />Phone: (7191542-3368 <br />FAX: (7191 544-0800 <br /> <br />http://water.state.co.us/default.hrm <br /> <br />Bill Owens <br />Governor <br /> <br />Greg E. Waldwr <br />Executive Director <br /> <br />April 12, 1999 <br /> <br />Hal D. Simpson, 1'.[, <br />Stale Engineer <br />Sleven). Witte, r,E. <br />Division Engineer <br /> <br />Arkansas River Compact. Administration <br />307 South 5th Street <br />Lamar, CO. 81052 <br /> <br />Mr. Larry Trujillo, <br />Mr. Peter Evans <br />Mr. Tom Point on <br />Mr. Jim Rogers <br /> <br />Chairman <br />Mr. David Pope <br />Mr. David Brenn <br />Mr, Randy Hayzlett <br /> <br />Re: City of Lamar <br /> <br />Dear Compact Administration Members: <br /> <br />I received the enclosed notification of the City of Lamar's intent <br />to utilize John Martin Reservoir to regulate releases of <br />Fryingpan-Arkansas Project water for municipal use. <br /> <br />As per the Administration's instructions to me at the December 12, <br />1989 meeting, I am forwarding this to the Administration members <br />for your consideration. It is my understanding that the City and <br />the Operations Secretary are to consider the Administration's <br />approval to have been granted unless objection is received from <br />either or both States comprising the Administration within a <br />three-week notice period by the Operations Secretary, Whereas, <br />this letter is dated April 6, 1999, I will expect any objection to <br />be filed with me by the close of business April 27, 1999, <br />otherwise thereafter I will allow the proposed operation to <br />commence. <br /> <br />The release of Fry-Ark Project water to be delivered to John <br />Martin Reservoir for subsequent re-regulation pursuant to this <br />request will be a separate and distinct operation from that which <br />occurred April 11, 1999 where a release from Pueblo Reservoir <br />occurred in conj unction . wi th a Bureau of Reclamation Safety of <br />Dams test, <br /> <br />Thank you for your consideration of this matter. <br />
The URL can be used to link to this page
Your browser does not support the video tag.