<br />00 <br />~ <br /> <br /><') <br />C\! <br /> <br />'. <br /> <br />and will allow Reclamation to accurately locatc thc sourcc ofthc sound, Rcfinemcnt of <br />the hydrophonics methodology continues, <br /> <br />Decisions regarding replacement or futher repairs of siphon pipes are to be made by , .,,, <br />Reclamation in J unc 1991. <br /> <br />Tucson Aqueduct pumping plants <br /> <br />. Twin Peaks and Sandario: Reclamation is delaying final acceptance of <br />pumps until manufacturer rebuilds and retests the units, <br /> <br />. Brawle)': Three of the five pumps have heen tested. Pump testing is <br />scheduled to be complete by mid-June 1991. <br /> <br />. San Xavier: The swilchyard was energized on February 28,1991. Two or the <br />five pumps have been tested, Pump tests at this platll arc scheduled to be <br />complete by mid-June 1991. <br /> <br />. Snyder HiJland Black Mountain: Structures for both plants are completed. <br />The switchyard is scheduled to be energized August )991. All pump and <br />motor units are on site. and installation is nearly complete. Pump testing is <br />scheduled to begin at Snyder Hill in August 1991 and at Black Mountain in <br />September 1991. <br /> <br />Tucson Aqueduct <br /> <br />New Wadd.ell Dam <br /> <br />Construction of the aqueduct is eompletc except for repairing 600 feet of canal lining on <br />Reach 3, nonhwest of Tucson. The repair is scheduled to be complete in August 1991. <br />Completion of some control and turnout structures remains on the )inal15 miles of the <br />system. Installation of control cables on the aqneduet from Twin Peaks Pumping Plant <br />to the end of the aquednet is underway, Erection of transmission lines on the final eight <br />miles of thc aqucduct will bcgin in August 1991. The pipclinc/tunncl system that will <br />deliver water to the City of Tucson's storage facility is complete except for pressure <br />grouting; this work will be complete in May 1991. <br /> <br />The upstream and downstream end of both tunels that will deliver CAP water to Lake <br />Pleasant are complete, The initial concrete placements for the intake towers that will <br />service the tunnels arc 80% complete (up to elevation 1660 fcet), Closurc section for the <br />PG Plant manifold pipe and steel tunnel liners is complete. The (unnels and towers are <br />scheduled to be complete by September 1\191. <br /> <br />Excavation of the dam fonndation is complete. About 5 million eobie yards of the <br />upstream and downstream sbell, zone .1 core, and filter and drain materials of thc dam <br />embankment have been placed, and this is 31 % complete. The dam embankment eleva- <br />tion is up to elevation 1,5OU feeL Tbe embankment is scheduled for completion by Sep- <br />tember 1992, South Park Road is complete and being used as a dctour for public tramc <br />around the spillway construction. Excavatinl1 for the spillway." ha~ hegun. <br /> <br />New Waddell Dam Pumping/Generating Plant <br /> <br />Structural wurk on the plant i!-l compklt:. JnslalJalilHl of pump/g.enerator <.:omponenl...., <br />such as suctiollwbcs and scroll cases, is underway. Work on the pl<Jnt's swilchyard con. <br />tinues and is sehednled for completion April 1992. Initial work on electrical wiring and <br />mechanical piping has begun. <br />