My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09344
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09344
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:53:01 PM
Creation date
10/12/2006 3:35:06 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8407.500
Description
Platte River Basin General Publications - Missouri River General Publications
State
CO
Basin
South Platte
Water Division
1
Date
9/1/1974
Author
USWRC
Title
1975 Water Assessment - Guidelines for Conducting Phase II - Specific Problem Analysis - Enclosure C
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />:';'ll)-activity Six - During this ,ub-activity the Regional Sponsor will <br />!Jro\-id~ th~ results of th~ evaluations made in Sub-activitr Five for r;.J.!li)l1- <br />\,..i~le revie\v (the tentative Regional :pt-eferenceFuture, .:loci assQci:l:eri <br />aS3LtTI1?tions, objecti\'es and desires ~ see Figure 2,). <br /> <br />In selecting participants for this sub-activity, the Regional Sprmsors <br />should follow the general guidance provided in Appendi.x B and the <br />following specific criteria. <br /> <br />1. The participants in this sub-activity should inclllde all of <br />those who participated in Sub- activity One plus additional <br />participants as selected by the Regional Sponsor. <br /> <br />2. Because this sllb-activity is basiCally a review activity, the _par- <br />ticipants should represent a wide but balanced variety of <br />interests and attitudes throughout the entire region to insure <br />that no viewpoint within the region is overlooked. <br /> <br />3. From a practical point of view, the Council suggests that the <br />participants in this review process be the same as those who <br />reviewed the initial problem list in Activity One (Group B). <br /> <br />In conducting this Activity, the Study Director will be responsible for <br />communications with the participants, for providing them with the <br />necessary information along with explanatory material and far providing <br />them with a specific format for review responses. This proces s may <br />occur through separate mailings to the individual participants, meetings <br />of the participants or some combination of both. <br /> <br />Sub-activitv Seven - During this sub-activity the Regional Sponsor will <br />synthesize the responses received from the regionwide review of both <br />the tentative Regional Preierence Future and the Modified Central Case, <br />and thereby establish a final Regional Preference Futl\re including pro- <br />jections, assUInptions, ane. effects. <br />, <br /> <br />T,he Study Director and his staff or a small work group (part of Group AI <br />'Nill be responsible i::>r c::>llecti:1g the revie\v responses, syn;J1esi~ing t}...,," <br />r0sponses hlto a proposed fi.:1al Regional Preference Future al1d then <br />re,.ciev.'-ing this prop:)seci. ii::2.1 future \vith the Regi~I:2.1 Spansorls policy <br />.::r~"p for final ap?r:>val. <br /> <br />20 <br /> <br />e <br /> <br />e <br /> <br />e <br />
The URL can be used to link to this page
Your browser does not support the video tag.