My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09314
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:47 PM
Creation date
10/12/2006 3:34:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
2/19/1941
Title
Draft of Proposed Findings and Recommendations for the Effectuation of Boulder Canyon Project Adjustment Act: Part II
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C"': <br />co <br />C" <br />C\.' <br /> <br />C <br /> <br />1 and all allottees and contractors to the same extent as it <br /> <br />2 it may be binding upon the Operating Agent submitting such <br /> <br />3 statement. <br /> <br />4 <br /> <br />(f) The total amount of any such statement as <br /> <br />5 submitted, less credit aD.owances as provided in Article <br /> <br />6 17 (h), shall be credited upon the next bill submitted by the <br /> <br />7 United States to such Operating Agent in its capacity as a <br /> <br />8 contractor for energy; provided, however, that such crediting <br /> <br />9 shall not preclude subsequent adjustment if through error or <br /> <br />10 the final disallowance of any part thereof the same shall have <br /> <br />11 been found to be incorrect in any particular. <br /> <br />12 <br /> <br />(g) If the amount of any such statement shall be <br /> <br />13 in excess of the amount so billed by the United states, then <br /> <br />14 the amount of such excess shall be deemed to be an advance pay- <br /> <br />15 ment of amounts thereafter to become due to the United states <br /> <br />16 from such Operating Agent in its capacity as a contractor for <br /> <br />17 electrical energy, and such Operating Agent in its capacity <br /> <br />18 as such contractor, shall be credited with interest on the <br /> <br />19 excess amount, or the remaining balancG thereof, at thG rate of <br /> <br />20 3 per cent per annum from the first day of the calendar month <br /> <br />21 follm~ng the submission of such statement until offset, by the <br /> <br />22 accrual of amounts due from such Operating Agent in its capacity <br /> <br />23 as a contractor for electrical energy, or paid as next herein <br /> <br />24 provided. <br /> <br />25 <br /> <br />(h) If all such advance payments have not been <br /> <br />26 so offset at the cloSG of any YGar of opGration, then the United <br /> <br />31 <br />
The URL can be used to link to this page
Your browser does not support the video tag.