My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09314
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:47 PM
Creation date
10/12/2006 3:34:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
2/19/1941
Title
Draft of Proposed Findings and Recommendations for the Effectuation of Boulder Canyon Project Adjustment Act: Part II
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />C'J <br />co <br />~ <br />C'< <br /> <br />C <br /> <br />1 costs; provided, hOITevor, th~t any such costs not readily <br /> <br />2 ascertainable at the date such statement is submitted may be <br /> <br />3 included therein on the basis of reasonable estinates, subject <br /> <br />4 to adjustnent to actual cost as soon as practicable thereafter, <br /> <br />5 or may, tosethor v~th any delayed items of cost, be included <br /> <br />6 in a subsequent statement. Simultaneously with the submission <br /> <br />7 of each such statement to the Director a copy thereof shall be <br /> <br />8 mailed or delivered by the Operating Agent to each allottee <br /> <br />9 and each contractor which shall have filed with the Secretary <br /> <br />10 a request for such copies and shall have furnished to the <br /> <br />11 Operating Agent a copy of such request, at an address specified <br /> <br />12 in such request. Each such allottee a~d each such contractor <br /> <br />13 shall have the ri ght at any time on or before the 25th day of <br /> <br />14 the calendar month next succeeding that in which such statement <br /> <br />15 is submitted to submit objections to any item of such statement, <br /> <br />16 and the right at any time within 30 days after the determination <br /> <br />17 of the Director as to the reasonableness or propriety of such <br /> <br />18 item to appeal to the Secretary from such determination, with <br /> <br />19 opportunity to be heard. Neither the making of such objection <br /> <br />20 nor the taking of such appeal shall delay the credit provided <br /> <br />21 for in Article 22 (f) hereof, but if any such objection shall <br /> <br />22 be sustr.ined by the Director or by the Secretary upon appea.l <br /> <br />23 subsequent adjustment shall be made as provided by said <br /> <br />24 Article 22 (r). Any determination of the Dire ctor or of the <br /> <br />25 Secretary as to the reasonz.bleness or propriety of any item of <br /> <br />26 such statement shall be binding upon tho other Operating Agent <br /> <br />,0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.