My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09314
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:47 PM
Creation date
10/12/2006 3:34:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
2/19/1941
Title
Draft of Proposed Findings and Recommendations for the Effectuation of Boulder Canyon Project Adjustment Act: Part II
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />00 <br />lr': <br /> <br />~' <br /> <br />C" <br /> <br />1 ins truct the Operating Agent affected as to the electrical <br /> <br />c <br /> <br />2 energy to be delivered to such con tractor, and such Operating <br /> <br />3 Agent shall comply with such direction. <br /> <br />4 <br /> <br />( c) Each Opera, ting Agent shall, upon receipt <br /> <br />5 of written notice from the Director that any contractor is not <br /> <br />6 anti tlod to further delivery of de ctrical energy under the <br /> <br />7 terms of its contract or con tracts, inrmecJj,ately dis cen tinue the <br /> <br />8 gereration for or delivery of electrical energy to such centractor <br /> <br />9 until receipt of further notice from the Director; provided, <br /> <br />10 however, that if such contractor and another contractor are <br /> <br />11 served through the saIne s'\vitches, or other facilities, located <br /> <br />12 at the Boulder Power Plant, so that it is not practicable to <br /> <br />13 dis corme ct at the Boulder Power Plant service to the contractor <br /> <br />14 not enti t18 d to ele ctrical energy, wi thout interrupting the service <br /> <br />15 to such other contractor, the Operating Agent shall not make such <br /> <br />16 disconnection, but, so far as roay be consistent with its obligations <br /> <br />17 under law or contract, shall use all means under its control <br /> <br />18 (woother' in its capacity as Operating Agent or othen-nse) to <br /> <br />19 accomplish discentinuance of delivery of electrical energy from <br /> <br />20 Boulder Power Plant to the con tractor not entitled thereto. <br /> <br />21 Compensation for Operation <br /> <br />22 <br /> <br />22. (a) Each Operating Agent shall receive as <br /> <br />23 compensation for the performance of its duties hereunder, an <br /> <br />24 amount equal to the aggregate of all costs properly and reasonably <br /> <br />25 in=red by it in such performance. The reasonableness or propriety <br /> <br />26 of such costs shall be deteJ:lllired b-<J the Director. Such costs shall <br /> <br />.. 26 <br />"'~, <br />
The URL can be used to link to this page
Your browser does not support the video tag.