My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09314
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09314
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:47 PM
Creation date
10/12/2006 3:34:44 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8220.200.05.R
Description
Hoover Dam/Lake Mead/Boulder Canyon Project
Basin
Colorado Mainstem
Date
2/19/1941
Title
Draft of Proposed Findings and Recommendations for the Effectuation of Boulder Canyon Project Adjustment Act: Part II
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />... <br />r:l <br />.,.. <br />.., <br />. '. <br /> <br />1 and egress from all works oper ated by the Operating Agents for <br /> <br />2 the pUIpose of inspection thereof, and for the purposes of operation <br /> <br />3 and maintenance of works operated directly by the United states, <br /> <br />4 and for all other proper purposes. <br /> <br />5 <br /> <br />(b) The Secretary, or his duly authorized <br /> <br />6 representatives, shall also have free access at all reasonable <br /> <br />7 tires to tho books, records e,nd accounts of the Operating Agents <br /> <br />8 relating to the operation, maintenance and replacanents of machinery <br /> <br />9 and equipment hereunder or to the generation and delivery of <br /> <br />10 electrical err: rgy hereundor, with the right at any time during <br /> <br />11 offic e hours to make copies of or from the same. Each of the <br /> <br />12 allottees of electrical anergy generated. at tho Boulder Power <br /> <br />13 Plant, through their duly authorized representatives, shall have <br /> <br />14 the like right of access and the right to make copies, limited, <br /> <br />15 however, to rm tters affect:ln[' the allottee exercising such right. <br />16 Generation.in Accordance with Contracts <br /> <br />17 <br /> <br />21. (a) Each Opera t:L1'lg Agent severally, in accordance <br /> <br />18 with the designations made in Article 15 hereof, shall generate, <br /> <br />19 and shall deliver at transmission voltage, electrical energy in <br /> <br />20 accordance wi th the requirements of contracts heretofore or here- <br /> <br />21 after made by the United States for the delivery of electrical <br /> <br />22 ere rgy from Boulder T'Jarn; provided that the United States shall <br /> <br />23 have provided generating, transforming and other equipment and <br /> <br />24 water adequate therefor. <br /> <br />25 <br /> <br />(b) In the event of dispute as to the electrical <br /> <br />26 energy to which any contractor is anti tled, the Dire ctor shall <br /> <br />2~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.