Laserfiche WebLink
<br /> <br />. . . <br /> <br />trc<' <br /> <br />4. Con~tructlon of a gasing statiCln and inotallation of a IITelemarkfl <br /> <br /> <br />telemetering device was recommended for installation just below <br /> <br />the Catlin name Total estimated costs to be about $7,000. To <br /> <br />this recommendation was assigned priority of need No.4. <br /> <br />5. Ripairs and general rehabilitation of the existing gaging <br /> <br />stations at Canyon City, SalidA and Granite were recommended <br /> <br /> <br />at a total estimated cost of about $7,500. To this recommendation <br /> <br />was assigned priority of need No.5. <br /> <br />6. Installation of radio or telephone telemetering stations 1n all <br /> <br />present and proposed gaging stations on the Arkansas River. <br /> <br />7. Reactivation of fo~er gaging stations, or construction of new <br /> <br />gaging stations, as may be the caee at the rollo~ locations: <br /> <br />a. Nyberg - south of Devine on the Arkansas River. <br /> <br />b. Pueblo - near Santa Fe Ave. bridge over Arkansas River. <br /> <br />c. Portland - just below old Highway 50 bridge acrose Arkansas <br />River. <br /> <br />d. Parksale - just above Highway 50 bridge acrOBS Arkansas River. <br /> <br />Costs and priorities for No. 6 and No. 7 are not now estimated or <br /> <br />recommended. Such costs and prioritlee will be assigned as need appears, <br /> <br />or requests are made. <br /> <br />At the close of the meeting, and with the approval of those present <br /> <br />at that meetill8, the above recommendations were read to D. E. Whitten, <br /> <br />State Engineer and Roy Burgess, State Hydrographer who indicated a <br /> <br />/ <br /> <br />wish to cooperate in the program to the limit of their authority and <br /> <br />budget. Present at this discussion were F. L. Sparks, Fred Boydston <br /> <br />and Wallace a. DJe. <br /> <br />t \/..., CO. <<. Cl ..1).~<. <br />Resident Engineer <br /> <br />2367 <br /> <br />.-----. <br />