My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09265
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09265
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:24 PM
Creation date
10/12/2006 3:33:10 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8443.600
Description
Narrows Unit - Studies
State
CO
Basin
South Platte
Water Division
1
Date
8/1/1966
Author
DoI, BoR
Title
Summary of the Preliminary Report on the Narrows Unit, Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
27
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />22 <br /> <br /> <br />Once the project has been authorized, construction funds are <br /> <br />requested two years in advance. <br /> <br />Thus at this time, it is impossible to predict with any <br /> <br /> <br />degree of accuracy when the Narrows Unit might receive construction <br /> <br /> <br />funds. <br /> <br />Once construction funds are available, a construction period <br /> <br />of 9 years has been estimated for the Narrows Unit. That lengthy <br />construction period appears to be necessary, primarily because of <br /> <br />the extensive railroad relocation involved. However, every effort <br /> <br />would be made to shorten the construction period, consistent with <br /> <br />sound engineering and fiscal considerations. <br />
The URL can be used to link to this page
Your browser does not support the video tag.