Laserfiche WebLink
<br /> <br />22 <br /> <br /> <br />Once the project has been authorized, construction funds are <br /> <br />requested two years in advance. <br /> <br />Thus at this time, it is impossible to predict with any <br /> <br /> <br />degree of accuracy when the Narrows Unit might receive construction <br /> <br /> <br />funds. <br /> <br />Once construction funds are available, a construction period <br /> <br />of 9 years has been estimated for the Narrows Unit. That lengthy <br />construction period appears to be necessary, primarily because of <br /> <br />the extensive railroad relocation involved. However, every effort <br /> <br />would be made to shorten the construction period, consistent with <br /> <br />sound engineering and fiscal considerations. <br />