Laserfiche WebLink
<br /> <br />21 <br /> <br /> <br />ffJluH CMU it A4 ~ ? <br /> <br />The present planning report dated August 1966 is a preliminary <br />draft. It has been distributed to the Commissioner of Reclamation <br />in Washington, the Chief Engineer in Denver, the field offices of <br />other Federal agencies, and to State and local agencies for review. <br /> <br />. <br /> <br />All review comments will be analyzed and the report will be <br /> <br /> <br />revised as necessary to become the final report of the Regional <br /> <br /> <br />Director. That report will then be resUbmitted to the Commissioner <br /> <br /> <br />of Reclamation for formal processing through the Washington offices <br /> <br /> <br />of appropriate Federal agencies. <br /> <br />The report will then be reviewed by the Bureau of the Budget <br /> <br /> <br />to determine its applicability with respect to the Administration's <br /> <br /> <br />fiscal policy. <br /> <br />Eventually, the report with all formal review comments will <br /> <br /> <br />be transmitted to the Congress of the United States where it would <br /> <br /> <br />be referred to the Interior and Insular Affairs Committees in the <br /> <br /> <br />Senate and House. Hearings are generally held by the subcommittee <br /> <br /> <br />and then by the full committee in the House and Senate. Meanwhile, <br /> <br /> <br />billa for authorization of the Narrows Unit probably will have been <br /> <br /> <br />introduced. If the full committees recommend approval of the Unit, <br /> <br /> <br />authorization bills will have to be approved by both the House and <br /> <br /> <br />Senate. The final bill will then be sent to the President of the <br /> <br /> <br />Uni ted States for approval or veto. <br />