<br />, <br /> <br />0818 <br /> <br />o <br /> <br />Construction Costs - Total construction costs for <br />the emergency reservoir, the pipeline system and <br />the pump houses are also the lowest at $75,000,000 <br />for the 100% case (200,000 bbljd) and $48,000,000 <br />for the .50% case (100,000 bbljd). See the Appen- <br />.dix for details of the magnitude estimate. <br /> <br />, <br />, <br /> <br />o Power Requirements - Alternative No. 6 is the most <br />favorable in power requirements necessary to lift <br />water to the dam site and on up to the distribu- <br />tion line on the plateau. Total horsepower for <br />the 100% case is 46,400 and 23,000 for the 50% <br /> <br />case. <br /> <br />o Pipeline Size and Length - Generally, pipeline <br />requirements are not significantly different for <br />Alternative No. 6 when compared to the other al- <br />ternatives. About 24 miles of 3D-inch pipe and <br />10 miles of 36-inch pipe are required for the <br />100% case. For the 50% case, only 22 miles of <br />3~-inch pipe are required. <br /> <br />11-2 <br />