My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09231
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:08 PM
Creation date
10/12/2006 3:32:25 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies (Alpha, not Basin Related)
State
CO
Basin
Gunnison
Water Division
4
Date
1/1/3000
Author
Unknown
Title
Forest Service Corres. - Statement of Work Estimating Water Yield from Changes in Management of National Forests in Colorado
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. 01J11179 <br /> <br />.. <br /> <br />3. Final Report: 15 days following receipt of comments on the draft Report, assuming <br />no additional analysis is needed. <br /> <br />The consultant will complete the analysis in 90 days following delivery of data to the consultant <br />from the Forest Service <br />The above schedule of deliverables encompasses that time frame. <br /> <br />Personnel <br /> <br />We request that this work be subcontracted to: <br /> <br />MA TCOM Corporation <br />2629 Redwing Road, Ste. 110 <br />Fort Collins, Colorado 80526 <br />Phone: (970) 229-0414 <br /> <br />Dr. Charles Troendle and Mr. James Nankervis will share the workload. Dr. Troendle's <br />participation, along with that of James Nankervis and other support will be subcontracted <br />through MATCOM. Dr. Troendle asswnes responsibility for completion and timely delivery of <br />all deliverables. <br /> <br />The quote for completion of the work is approximately $190,000.00. The work can be divided, <br />or contracted, by major river basin. <br /> <br />A more thorough and complete proposal will be drafted in response to an RFP. <br />
The URL can be used to link to this page
Your browser does not support the video tag.