My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09218
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:02 PM
Creation date
10/12/2006 3:31:46 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.765
Description
Little Snake River General
State
CO
Basin
Yampa/White
Water Division
6
Date
7/31/1990
Author
Western Water Consul
Title
Final Report on Little Snake River Depletions by Pot Hook - Three Forks - and Powder Wash Rights
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />: onDg 30 <br /> <br />At the request of CRWCD, the Pot Hook Project configurations as defined in the <br /> <br />USBR Definite Plan Report were used in this study. For Scenario 1 and lA the reservoir <br /> <br />was assumed to have 60,000 AF of total capacity with only 26,000 AF active storage. For <br /> <br />Scenario IB the reservoir was assumed to have a total storage capacity of 100,000 AF <br /> <br />resulting in 66,000 AF active capacity. The June 5, 1959 priority date provides for 73,580 <br /> <br />AF of storage. For this study it was assumed that the decreed amount was for active <br /> <br />storage and therefore the June 5, 1959 priority date was applicable for all scenarios <br /> <br />modeled. A minimum storage amount of 34,000 AF (dead and inactive storage) was <br /> <br />assumed in the Pot Hook Project modeling. This minimum storage level was proposed <br /> <br /> <br />in the USBR Definite Plan Report, and is required to provide the desired water surface <br /> <br /> <br />elevation for diversions to Pot Hook Canal. This large minimum storage will incidently <br /> <br /> <br />increase recreation benefits. Area-capacity curves, as developed by USBR, were used in <br /> <br />the modeling (see Appendix C). <br />During the initial investigation, Pot Hook Reservoir was modeled both with a one- <br /> <br /> <br />fill limitation and with multiple fills permitted each year. There was insignificant <br /> <br /> <br />difference in the results and therefore only the results from the one-fill limitation modeling <br /> <br /> <br />runs are reported herein. <br /> <br />Modeled project demands under Scenario 1 included storage and direct flow <br /> <br />diversions by the Pot Hook Canal, Two Bar Canal, and the Boone and Deer Lodge <br /> <br />Laterals. For Scenarios lA and IB only Pot Hook Canal was permitted to call on <br /> <br />reservoir storage. In the Water Development Baseline, irrigation demands were set at <br /> <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.