My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09218
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09218
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:52:02 PM
Creation date
10/12/2006 3:31:46 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8200.765
Description
Little Snake River General
State
CO
Basin
Yampa/White
Water Division
6
Date
7/31/1990
Author
Western Water Consul
Title
Final Report on Little Snake River Depletions by Pot Hook - Three Forks - and Powder Wash Rights
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
152
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />000359 <br /> <br />TABLE 3. SUMMARY OF WIRSOS INPUT FOR POT HOOK PROJECf <br /> <br />'I <br /> <br />Pot Hook Reservoir Data <br />Storage right, priority date of 6-5-59 (73,580 AF) <br />Enlargement right, priority date of 4-19-66 (100,000 AF) <br />Minimum storage volume <br />Maximum storage volume (Scenarios 1 and lA) <br />Maximum storage volume (Scenario IB) <br />Maximum primary outlet capacity to Slater Creek <br />Initial storage volume at beginning of <br />study period (70% Total) (Scenarios 1 and lA) <br />Initial storage volume at beginning of <br />study period (70% Total) (Scenario lB) 70,000 AF <br />Area - Capacity relationship (as developed by USBR) (See Appendix C) <br /> <br />= <br /> <br />60,000 AF <br />OAF <br />34,000 AF <br />60,000 AF <br />100,000 AF <br />1,000 cfs <br /> <br />= <br /> <br />= <br /> <br />= <br /> <br />= <br /> <br />= <br /> <br />= <br /> <br />42,000 AF <br /> <br />Instream Flow <br />Instream flow requirements in Slater Creek below dam <br /> <br />= <br /> <br />24 cfs <br /> <br />Irril!ation Diversion Data <br />Pot Hook Canal (canal capacity = 290 cfs) <br />Diversion right, priority date of 6-5-59, (260 cfs) <br />Enlargement right, priority date of 4-19-66 (400 cfs) <br />Two Bar Canal: <br />Diversion right, priority date of 6-5-59 <br /> <br />= <br /> <br />260 cfs <br />30 cfs <br /> <br />= <br /> <br />= <br /> <br />100 cfs <br /> <br />Boone Lateral: <br />Diversion right, priority date of 6-5-59 <br /> <br />= <br /> <br />16 cfs <br /> <br />Deer Lodge Lateral: <br />Diversion right, priority date of 6-5-59 <br /> <br />= <br /> <br />23 cfs <br /> <br />Demand Schedule: <br />U.S.B.R. Diversion Demand Schedule <br /> <br />Irrigation Use Efficiencies and Return Flow Schedules: <br />Same as Water Development Baseline <br /> <br />For Scenario 1 the Two Bar Canal and Boone and Deer Lodge Laterals call upon storage <br />in Pot Hook Reservoir if direct flows are insufficient to meet demand. <br /> <br />For Scenarios lA and IB the Two Bar Canal and Boone and Deer Lodge Laterals <br />received direct flows only, they were not permitted to call on Pot Hook Reservoir <br />storage. <br /> <br />24 <br />
The URL can be used to link to this page
Your browser does not support the video tag.