My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09138
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:51:29 PM
Creation date
10/12/2006 3:28:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8149.100
Description
Miscellaneous Small Projects and Project Studies - NRCS-Ft Lyon Canal Co Limestone Graveyard Creeks
State
CO
Basin
Arkansas
Water Division
2
Date
10/26/1992
Author
Gronning Engineering
Title
Plan of Study Ft Lyon Canal Company
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />0266 <br /> <br />TABLE 1. PROJECT RESPONSIBILITIES qv TASK AND DISCIPLINE <br /> <br />TASK ASSIGNMENTS <br /> <br />1. Issue identification, water transfer <br />process, historic Arkansas Valley <br />transfers <br /> <br />2. Evaluate water demands <br /> <br />3A. Description of the Ft. Lyon: <br />physical system, organization <br /> <br />3B. Ft. Lyon service area: social, <br />econontic, en~onrnental <br /> <br />4. Establish baseline, develop scenarios, <br />and evaluate scenarios <br /> <br />5. Conceptual design of selected <br />alternative(s) <br /> <br />6. Summary, conclusions and <br />recommendations: final report <br /> <br />X. Project management and data <br />support <br /> <br />Lead Professional <br />Kevin Pratt <br /> <br />Lloyd Gronning <br />Lloyd Gronning <br /> <br />Dr. Chas. Cortese <br /> <br />a) Dr. Chas. Cortese. <br />and Dr. G. Milliken <br />b) Kevin Pratt <br />c) All members <br /> <br />Dr. John Clark <br /> <br />Dr. John Clark <br /> <br />Dr. John Clark and <br />Lloyd Gronning <br /> <br />Assigned responsibilities are further defined as follows: <br /> <br />Assistance <br /> <br />Lloyd Gronning <br />Dr. John Clark <br /> <br />Dr. G. Milliken <br /> <br />GEC engineering <br />Bill Milenski <br /> <br />Dr. G. Milliken <br />Dr. John Clark <br /> <br />Lloyd Gronning <br />GEC engineering <br /> <br />Lloyd Gronning <br />All members <br /> <br />Bill Milenski <br />Sallye Sntith <br /> <br />The Lead professional: has a focused responsibility in the assigned tasks for fonnuJation of task <br />methodology, assembly of data, assessment of data, and development of findings to the draft stage. <br />He is responsible for directing all needed infonnal interaction with other team members as required <br />and for coordination of internal task review through the assisting professional and the team leader. <br /> <br />The Assisting professiona1(s): has focused responsibility for continuing participation in the assigned <br />task. This includes review of methodology and development of findings through the draft stage. <br /> <br />The Team Leader. As team leader, Dr. Clark is responsible for project coordination, team interaction, <br />research documentation, and compilation of the required reports. <br /> <br />More detailed infonnation about team members and supporting staff is provided in their resumes, <br />attached as Appendix A. <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.