Laserfiche WebLink
<br />m <br /> <br />0308 <br /> <br />Steven D. Leslie, P.E., C.C.S. <br />Project Engineer <br />Page 2 <br /> <br />BOONE FLUME AND LAKE HENRY BIFURCATION, CO -- Designed modifications to concrete structures <br />to extend their useful life. The Boone flume is a 35 foot Parshall flume that needed repair of scour <br />holes and leveling of the concrete floor. The bifurcation structure required extensive reconstruction <br />of the downstream wingwalls and stilling basin. <br /> <br />HYLAND HILLS PARKAND RECREATION DlSTRIcr, CO n Provided CAD design services for three new <br />baseball fields on a slope with a 45.50 foot drop over 500 feet on a 9-acre site with 40,000 yards of <br />cut and fill, as well as the design of a lOO-car parking lot. Three existing baseball fields and <br />surrounding area will be converted into paved parking for 1600 cars. One of the project tasks is to <br />work with the Disnict and their landscape architect to prepare an economic plan. Cut and fill <br />calculations will be provided along with soils testing and surveying coordination, and construction <br />drawings and specifications preparation. A new park entrance will be designed with a dropoff area <br />accommodating handicapped individuals. A drainage report and coordination with the local regulatory <br />- agency is required. Due to the site being greater than 5 acres, a stormwater pennit application will <br />be filed with the State. <br /> <br />BERRY DROP STRUCTURE, CO .. Conducted field inspection for construction of large concrete drop <br />structure. Responsibilities included: interpretation of contract documents; observation of construction <br />for compliance with drawings and specifications; coordination of work; shop drawing and submittal <br />review; concrete and soil field testing; processing of field otdets, change orders, and applications for <br />payment. Construction cost is approximately $Ic5,aOO. <br /> <br />COLORADO SPRl:-;GS RAW WATER DELIVERY STUDY, CO n Assisted with hydrologic analyses of <br />several major raw water collection systems. Determined watershed runoff and diversion system <br />capacities to develop potential warershed yields. Helped prepare written technical memorandum and <br />reports. <br /> <br />LYMAN DITCH RESTORATION PROJECT, CO n Conducted field investigation of inigation ditch and <br />associated snuctures including measuring flume, elevated flume, and inverted siphon. Helped develop <br />ditch restoration plan and cost estimates to restore ditch to decreed capacity of 26 cfs. Assisted with <br />design of repairs and restoration work to ditch, measuring flume and inverted siphon. Also assisted <br />in design of replacement elevated flume as old flume was beyond economical repair. Estimated <br />construction cost is $80,700. <br /> <br />SECONDARY WATER SYSTEM, MONTICELLO, UT .- Conducted field inspection for the installation of <br />a day bentoni,e liner in an. irrigation reservoir. Responsibilities included: interpretation of contract <br />documents; observation of construction for compliance with plans and specifications; coordination of <br />communication between engineer, Cicy of Monticello, and contractor; shop drawing review; <br />preparation and processing of field orders, change orders, and applications for payment. <br /> <br />WATER DISTRIBUTION SYSTEM ANALYSIS, FORT CARSON, COLORADO SPRINGS, CO -. Assisted in <br />field engineering including fire hydrant flow tests, line valve tests, and friction factor coefficient tests. <br />Assisted in water system analysis including calculation of present and future domestic, indusnial, <br />irrigation, and fire flow water demands. Helped set up and calibrate a computer model of the entire <br />Fort Carson water system using the "Kentucky Water System Model" computer program. Assisted in <br />writing a final report detailing procedures, conclusions, and recommendations for future improvements <br />with cost estimates. <br />