<br />0292 <br /> <br />TABLE 5. MONTHLY TIME AVAILABILl1Y AND PROJECf RESPONSIBILITY <br /> <br /> MONTHLY PROJECf <br />NAME TIME AVAIIABILl1Y RESPONSIBILI1Y <br />Uoyd J. Gronning, P.E. 25% Contract negotiation and <br /> performance, assist in direction <br /> and management of study <br />John Clark, Ph.D., P.E. 50% Project Manager, directs and <br /> manages all services including <br /> those provided by subcontractors <br />John Winchester 50% Assists in the development of <br /> engineering analyses, data <br /> collection, scenario and <br /> conceptual design development <br />Steve Leslie, P.E. 50% Assists in the development of <br /> engineering analyses, data <br /> collection, scenario and <br /> conceptual design development <br />Kevin Pratt, J.D. 250;& Provides legal counsel and <br /> guidance on water rights and <br /> environmental issues involved in <br /> water transfers <br />Gordon Milliken, Ph.D., 25% Conducts economic analyses of <br />P.E. impacts in the Ft. Lyon service <br /> area and develops economic <br /> impact scenarios <br />Charles F. Conese, Ph.D. 25% Conducts sociological analyses of <br /> impacts in the Ft. Lyon service <br /> area and develops sociological <br /> impact scenarios <br />Don Nielsen 25% Assists in agricultural aspects of <br /> Ft. Lyon Canal system and in the <br /> development of scenarios and <br /> alternatives <br />Bill Milenski 25% Assists in water valuation and <br /> input to economic analyses <br /> within the service area <br />Sallye Smith 10% Assists in research of existing <br /> records and repons available in <br /> regard to the irrigation and <br /> water use in the lower Arkansas <br /> Valley <br /> <br />31 <br />