My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09138
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09138
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:51:29 PM
Creation date
10/12/2006 3:28:59 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8149.100
Description
Miscellaneous Small Projects and Project Studies - NRCS-Ft Lyon Canal Co Limestone Graveyard Creeks
State
CO
Basin
Arkansas
Water Division
2
Date
10/26/1992
Author
Gronning Engineering
Title
Plan of Study Ft Lyon Canal Company
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
69
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />02{lO <br /> <br />Summary and Conclusions of Relevant ExPerience <br /> <br />The single most important factor for the CWCB to consider in the successful completion of this <br />study is the capabilities of the professionals engaged to do the work. The word 'capabilities' <br />encompasses many attributes: knowledge, skills, training, organization, management, creative thinking, <br />sensitivity to the task at hand, and ability to meet the client's needs. Our project team possesses the <br />required capabilities because: <br /> <br />. Task leaders cany advanced degrees in their fields and years of research experience <br />and practical project experience. <br /> <br />. Over one-half of the project team was raised in or currently works in the Arkansas <br />River Valley. All team members have prior project experience in the valley. <br /> <br />. The entire team maintains a high degree of interest in this study, which is an effort of <br />major importance in the evolution of Colorado's water resource management. <br /> <br />. Each team member is committed to remain available during the period of the study, <br />giving the study his fullest personal attention. <br /> <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.