Laserfiche WebLink
<br />FT. LYON CANAL COMPANY WATER TRANSFER STUDY <br /> <br />GRAPHIC SCHEDULE <br /> <br />TAIl. DI8CUP110H <br /> <br />TASKS PHASE 1 NOV-FEB 1993 <br /> <br />"" <br /> <br />NOY <br /> <br />Dre <br /> <br />w. <br /> <br />n. <br /> <br /> <br />I. ISSUE IDENTIFICATION <br /> <br />1. EVALUATE WATER DEMANDS <br />3. A) DESCRIPTION OF FT. LYON <br />SYSTEM <br />B) FT. LYON SERVICE AREA <br />4. ESTABLISH BASELINE WATER <br />SCENARIOS <br /> <br />TASKS PHASE 1 MAR-SEP 1993 <br /> <br />5. CONCEPTUAL DESIGN <br /> <br />6. SUMMARY, CONCLUSIONS, <br />AND FINAL REPORT <br /> <br />ti METriNG WITH cweB STAFF <br /> <br />U PUBLIC MEETING <br /> <br />.... <br /> <br />..., <br />...y <br /> <br />An <br /> <br /> <br />JUN <br /> <br />uti <br /> <br />ruL <br /> <br /> <br />AUO <br /> <br />U <br /> <br />o <br />f\:'l <br />go <br />Cl <br /> <br />... <br /> <br />FIGURE 2 <br />