Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />Activity 2b - Other Meetings - No meetings shown as <br />milestones on the Study Schedule were held during the <br />period. Other meetings not shown as milestones on the <br />Study Schedule are included in the list of meetings which <br />is included as Attachment B to this report. <br /> <br />Activity 3a - Collection and Review of Existing Data - <br />This activity is largely complete; however, some data co1- <br />lect'ion and review continues as necessary during other <br />activities. <br /> <br />Activity 4a - Compile Hydrologic Data Base - This <br />activity has been completed. <br /> <br />Activity 4b - Analyze Water Supply Data - This activi- <br />ty has been completed for the preliminary phase of the <br />study. <br /> <br />Activity 4c - Analyze Flood Hydrology Data - This <br />activity has been completed for the preliminary phase of <br />the study. <br /> <br />Activity 4d - Analyze Sedimentation Data - This ac- <br />tivity has been completed for the preliminary phase of the <br />study. <br /> <br />Activity Sa - Compile Water Use Data - This activity <br />has been completed. <br /> <br />Activity 5b - Analyze Present Uses and Anticipated <br />Future Uses - Work on this activity has been completed for <br />the preliminary phase of the study. <br /> <br />Activity 5c - Develop Future Water Use Scenarios - <br />Work on this activity has been completed for the prelimi- <br />nary phase of the study. <br /> <br />NBID-965-5-SRN06 <br /> <br />3 <br />