Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />CACHE LA POUDRE PROJECT <br /> <br />STATUS REPORT NO. 7 <br /> <br />1. General <br /> <br />This report describes the a~tivities and progress by Tudor <br />Engineering Company (Tudor) on the Cache la poudre Project <br />during the period June 19, to July 16, 1982. <br /> <br />2. Progress <br /> <br />Progress on the various Activities in the study is shown on <br />the Study Schedule, which is included as Attachment A to this <br />report. <br /> <br />Following is a discussion of progress on the individual <br />'. Activities: <br /> <br />Activity la - Prepare Detailed Plan of Study - The <br />Detailed Plan of Study was approved by the Colorado Water <br />Conservation Board and distributed to the Advisory Com- <br />mittee on March 30, 1982. <br /> <br />Activity lb - Project Coordination and Control - Vari- <br />ous work activities were coordinated during the reporting <br />period. <br /> <br />Activity lc - Status Reports - Status Report No. 6 <br />covering the period May 22 to June 18, 1982, was prepared <br />and transmitted to the Board on June 25, 1982. <br /> <br />Activity <br />meetings with <br /> <br />period. <br /> <br />2a Advisory Committee Meetings No <br />the Advisory Committee were held during the <br /> <br />NBID-965-S-SRN06 <br /> <br />2 <br />