Laserfiche WebLink
<br />.. <br /> <br />comments, suggestions. or arguments <br />with respect to the proposed amendment <br />to the Project Engineer, Flathead Irri- <br />gation Project, St. Ignatius, Mont. <br />59865. on or before June I. 1973. <br /> <br />( Sections 221.24, 221.26. and 221.28 are <br />amended to read as follows: <br /> <br />~ 221.24 Charges. <br /> <br />Pursuant to a contract e~ecuted by the <br />Flathead Irrigation District. Flathead In. <br />dian Irrigation Project. Mont., on May <br />12. 1928, as supplemented and amended <br />by later contracts dated February 27. <br />1929, March 2B, 1934, Augwt 26. 1936, <br />and April 5, 1950. there Is hereby .fixed <br />for the sea.son of 1974 an assessment of <br />$454,618.67 for the operation and main- <br />tenance of the irrigation system which <br />serves that portion of the project within <br />the confines and under the imisctiction <br />of the F1athead Irrigation District. 'I11is <br />assessment involves an area of approxi. <br />mately 86,102.02 acres, which does not <br />include any land held in trust for In- <br />dians and covers all proper general <br />charges and project overhead. <br /> <br />~ 221.26 Churgcl'l.. <br /> <br />Pursuant to a contract executed by <br />the Mission Irrigation District, Flathead <br />Indian Irrigation Project, Mont.. on <br />March 7. 1931, approved by the Secre- <br />tary of the Interior on April 21, 1931. as <br />supplemented and amended by later <br />contracts dal;ed June 2. 1934, June 6. <br />1936, and May 16. 1951, there is hereby <br />fixed, for the season of 1974 an assess- <br />mentor $82,847.07 for the operation and <br />maintenance of the irrtgation system <br />which serves that portion of the project <br />within the confines and under the jwis- <br />diction of the MissIon Irrigation District. <br />This assessment involves an area of ap- <br />proximately 16,437.91 acres, which does <br />not include any land held in trust for <br />Indians and covers all proper general <br />charges and project overhead. <br /> <br />~ 221.28 Charges. <br /> <br />Pursuant to a contract executed by <br />the Jacko Valley Irrigation District. <br />Flathead Indian Irrigation Project. <br />Mont., on November 13, 1931. approved <br />by the Secretary of the Interior on Feb- <br />ruary 26, 1935. as supplemented and <br />amended by later contracts dated Au- <br />gwt 26, 1936, April lB. 1950. and Au- <br />gust 24. 1967, there is hereby fixed for <br />the season of 1974 an assessment of $32,- <br />724.88 for the operation and mainte- <br />nance of the' Irrigation system which <br />serves that portion of the project within <br />the confines and under the jUrisdiction <br />of the Jacko Valley Irrigation District. <br />This assessment involves an area of ap- <br />proximately 7.522.96 acres, which does <br />not include any lands held in trust for <br />Indians and covers all proper general <br />charges and project overhead. <br /> <br />GEORGE L. MOON. <br />Project Engineer. <br /> <br />IFR Doc.'73-8571 Filed 5-1-73;8:45 am] <br /> <br />..) <br /> <br />.. <br />r <br /> <br />PROPOSED RULES <br /> <br />ATOMIC ENERGY COMMISSION <br />[10 CFR ParlSO] <br />LICENSING OF PROOUCTION AND <br />UTILIZATION FACILITIES <br />Technical Specifications for Fuel <br />Reprocessing Plants <br />The Atomic Energy Commission 15 con- <br />sidering amendments to its regulations <br />which would add provisIons for cate- <br />gorIes of technical specifications for li- <br />censes for fuel reprocessing plants to <br />~ 50.36 of 10 CPR .part 50. Technical <br />specitl.cations set forth the specific char- <br />acteristics of the facility and the condi- <br />tions for Its operation that are required <br />to prOvide protection for the health and <br />safety of the public. The technical spec- <br />ifications are included in the license, and <br />cannot be changed without prior Com- <br />mission approvaL <br />On December 17, 1968. the Atomic En- <br />ergy Commission published in the FED- <br />ERAL REGISTER (33 PH 18610) amend- <br />ments to 10 CFR part 50 whIch, among <br />other things. added provisions for cate- <br />gories of teclmtcal &pecifications appli- <br />cable to nuclear reactor licenses to <br />~ 50.36 of part 50. Appropriate categories <br />for technical specitl.cat1ons applicable to <br />fuel reprocessing plant licenses had not <br />at that time been developed. <br />Cate:;ories of technical speciflcations <br />approprIate for fuel reprocessing plant <br />licenses have now been developed. They <br />include (1) safety I1m1ts and limiting <br />control settings, (2) limiting conditions <br />for operation, (3) surveillance require- <br />ments, (4) design features, and (5) ad. <br />ministrative controls. <br />In addition to the changes in ~ 50.36 <br />to cover fuel reprocessing plants specitl.- <br />cally, a number of minor editoI1al and <br />clarlIying changes are included in the <br />proposed amendments. <br />Concurrently, with the publication of <br />this notice of proposed rnlemaking, the <br />Commission is Issuing a notice of issu- <br />ance and availabll1ty of regulatory guide <br />3.6 entitled "Guide to Content of Tech- <br />nical Specifications for Fuel Reprocess- <br />ing Plants". <br />Pursuant to the AtomIc Energy Act of <br />1954. as amended. and section 553 of title <br />5 of the United States Code, notice is <br />hereby given that adoption of the fol- <br />lowing amendments to 10 CFR part 50 <br />is contemplated. All Interested persons <br />who desire to submit written comments <br />or suggestions for consideration in con- <br />nection with the proposed amendment <br />should send them to the Secretary of the <br />Commission, U.S. Atomic Energy Com~ <br />mission, Washington, D.C. 20545, Atten- <br />tion: Chief. Public Proceedings Starr, by <br />July 2, 1973. Copies of the cOD].IIlents on <br />the proposed amendments may be ex~ <br />amined at the Commtsslon's Public Doc- <br />ument Room at 1717 H Street NW., <br />Washington, D.C. <br />The prefatory language of ~ 50.36 (c) . <br />and subparagraphs (1) and (2) of <br />~ 50.36 (c) are ameDded to read as <br />follows: <br /> <br />. <br /> <br />10815 <br /> <br />650.36 Technical spccificalions. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />(c) Teclu1ical specifications will in- <br />clude Items in the following categories: <br />(1) Safety limits, limiting safetu sys- <br />tem settings, and limiting control set- <br />tings.-(I) (A) Safety limits for nuclear <br />reactors are limits upon important proc- <br />ess variables whtch are fOWld to be <br />necessary to reasonably protect the in. <br />tegri ty of certain of the physical bar- <br />riers which guard against the uncon- <br />trolled release of radioactivity. If any <br />safety limit is exceeded, the reactor shall <br />be shut down. The licensee shall notUy <br />the CommIssion. review the matter and <br />record the results of the review, includ- <br />ing the cause of the condition and the <br />basis for corrective action taken to pre- <br />clude reoccurrence. Operation shall not <br />be resumed untll authorized by the <br />Commission. <br />(B) Safety limits for fuel reprocessing <br />plants are those bounds wIthin which <br />the process variables must be maintained <br />for adequate control of the operation and <br />which must not be exceeded In order to <br />protect the integrity of the physical <br />system which Is desIgned to guard <br />against the uncontrolled release of radio- <br />activity. If any safety limit for a fuel <br />reprocessing plant Is exceeded. correc- <br />tive action shall be taken and the af- <br />fected part of the process. or the entire <br />process it reqUired. shall be shut down, <br />unless such action would further reduce <br />the margin of safety. The licensee shall <br />notify the Commission, review the ma t- <br />ter and record the results of the review, <br />inclUding the cause of the condition and <br />the basis for corrective action taken to <br />preclUde reoccurrence. If a portion of <br />the process or the entire process has been <br />shut down. operation shall not be re- <br />sumed until authorized by the Com- <br />mission. <br />(1) (A) Limiting safety system set- <br />tings for nuclear reactors are settings <br />for automatic protective devices related <br />to those variables having significant <br />safety functions. Where a limiting safety <br />system setting is specified for a variable <br />on which a safety limIt has been placed. <br />the setting shaH be so chosen that auto- <br />matic protective action wlII correct the <br />abnormal situation before a safety limit <br />is exceeded. If, during operation, the <br />automatic safety system does not func- <br />tion as required, the licensee shall take <br />appropriate action. which may include <br />shutting down the reactor. He shall <br />notify the Commission, review the mat- <br />ter and record the resul ts of the revIew. <br />including the cause of the condition and <br />the basis tor corrective action taken to <br />preclude reoccurrence. <br />(B) Limiting control settings for fuel <br />reprocessing plants are settings for auto~ <br />matic alarm or protective devices re- <br />lated to those variables having signifi- <br />cant safety frmctlons. Where a limltIng <br />control setting is specifled for a. vari- <br />able on which a safety limit has been <br />placed, the setting shall be 50 chosen that <br /> <br />f)fj68 <br /> <br />FEDERAL REGISTER, VOL. 38, NO. 84-WEDNESDAY, MAY 2, 1973 <br />