My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09124
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09124
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 9:50:03 PM
Creation date
10/12/2006 3:28:36 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies (Alpha, not Basin Related)
State
CO
Date
4/4/1966
Author
F M Clinton
Title
U S Dept of Interior - Bur of Reclam - Region 4 - Corres. Reports - 1965-1966 - Report by the Bureau of Reclamation, Region 4, to the Colorado Water Conservation Board
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />. <br /> <br />GUl~JJ <br /> <br />. <br /> <br />. <br /> <br />., . <br /> <br />Water supply studies, engineering surveys, <br /> <br />~ <br />geologic investigations, <br /> <br />and preparation of the plan formulation appendix are in progress on the <br /> <br />Bluestone project. A prepared feasibility report is scheduled for com- <br /> <br />pletion in FY 1967. <br /> <br />On the Upper Gunnison project, plan formulation studies, water sup- <br /> <br />ply studies, land classification studies, and drainage studies are con- <br /> <br />tinuing. A proposed feasibility report is scheduled for completion in <br /> <br />FY 1969. <br /> <br />Feasibility investigations are continuing on the Grand Mesa proj- <br /> <br />ect, consisting of water supply studies, plan formulation studies, and <br /> <br />preparation of plan formulation, drainage, and land classification appen- <br /> <br />dices. Aerial topographic mapping of the Electric Mountain service <br /> <br />canal by private contract is in progress. Foundation explorations on <br /> <br />Cactus Park Damsite (alternative for Gorsuch) have been completed. A <br /> <br />proposed feasibility report is scheduled for completion in FY 1968. <br /> <br />Preparation of design data for the yellow Jacket Canal, Josephine <br /> <br />Basin Canal, Lost park collective systems, and project laterals are in <br /> <br />progress for the Yellow Jacket project. Geologic investigations, and <br /> <br />preparation of project lands, drainage, and water supply appendices are <br /> <br />also in progress. A proposed feasibility report is scheduled for com- <br /> <br />pletion in FY 1967. <br /> <br />ADVANCE PLANNING <br /> <br />On the Fruitland Mesa project feasibility report data on agricultural <br /> <br />economy, land classification, water supply, and cost estimates are being <br /> <br />5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.