My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP09092
CWCB
>
Water Supply Protection
>
Backfile
>
9001-10000
>
WSP09092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/29/2009 9:50:20 PM
Creation date
10/12/2006 3:27:32 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8027
Description
Section D General Correspondence - Federal Agencies (Alpha, not Basin Related)
State
CO
Date
1/14/1966
Author
F M Clinton
Title
U S Dept of Interior - Bur of Reclam - Region 4 - Corres. Reports - 1965-1966 - Report by the Bureau of Reclamation, Region 4, to the Colorado Water Conservation Board
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />001u/3 <br /> <br />. <br /> <br />. <br /> <br />Feasibility investigations are continuing on the UPPER GUNNISON <br /> <br />PROJECT, consisting of land classification, drainage studies, water sup- <br /> <br />ply studies, and plan formulation studies. A proposed feasibility report <br /> <br />is scheduled for completion in FY 1969. <br /> <br />I <br />, <br /> <br />Plan formulation studies, geologic investigations, water supply <br /> <br />studies, and preparation of project lands and drainage appendixes are <br /> <br />in progress on the GRAND MESA PROJECT. A contract has been awarded for <br /> <br />aerial topographic maps of the project area and work has been initiated <br /> <br />by the contractor. Coo:perative studies with other Federal agencies are <br /> <br />continuing. A proposed feasibility report is scheduled for completion <br /> <br />in FY 1968. <br /> <br />Preparation of design data, engineering surveys, geologic investi- <br /> <br />gat ions, and preparation of the drainage appendix are in progress on the <br /> <br />YELLOW JACKET PROJECT. Cooperative studies with other Federal agencies <br /> <br />are continuing. A proposed feasibility report is scheduled for comple- <br /> <br />tion in FY 1967. <br /> <br />Advance Planning <br /> <br />On the FRUITLAND MESA PROJECT aerial topographic mapping of the <br /> <br />project area by private contract is essentially complete. <br /> <br />Funds ($2,400) contributed by the local conservancy districts and <br /> <br />the State of Colorado were used in obtaining aerial photography of the <br /> <br />SAVERY-POT HOOK PROJECT area to be used later for five-foot-contour <br /> <br />aerial mapping of the project area. Advance planning studies are being <br /> <br />undertaken in FY 1966. <br /> <br />8 <br />
The URL can be used to link to this page
Your browser does not support the video tag.