Laserfiche WebLink
<br />20 <br /> <br />13. Draft project plan and interim reports as needed. Obtain pub) ic <br />opinion of draft plan. <br /> <br />14. Prepare final plan and publish as a special sa1 inity project report. <br /> <br />Schedule of Activities <br /> <br />The Lower Gunnison Sal inity Control Project evaluation will be timed to <br />coincide with the schedule for the USBR Lower Gunnison Basin Unit st'Jdies <br />scheduled for completion in FY i977. The Soil Conservation Service wi1) <br />work closely with the Bureau of Reclamation to provide consistent evalua- <br />tions and exchange of data as it becomes available. Specific funding <br />and staffing estimates are presented in Table I. <br /> <br />Funding and Staffing <br /> <br />All funding for the Lower Gunnison Unit Sal inity Control Project studies <br />by the USDA wi! I come from regular river basin investigation funds (RB- <br />09) of the Soil Conservation Service. Prel iminary estimates indicate <br />that the Lower Gunnison Unit Sal inity Control studies would require <br />approximately 1,060 man-days and an estimated $154,000 in funding to <br />complete the special requirements of the sal inity control study. <br /> <br />Progress Reports <br /> <br />Progress reports on the Lower Gunnison Basin Sal inity Control studies <br />wi 11 be prepared annually (.November) except for significant accompl ish- <br />ments and phases of work needed for coordination with other agencies. <br />The coo~dinating committee will determine the specific requirements for <br />progress reports and their distribution. <br /> <br />OO'3A)~ <br />