Laserfiche WebLink
<br /> <br />. <br /> <br />. <br /> <br /> <br />. <br /> <br />I::;> <br /><, <br />i'o"" <br />~ <br />N <br />~ <br /> <br />ins al1ed capacity 4l1,600 k\'r. manufacturer'sI'ated cap- <br />acit , ryhiCh, at $$7.50 per k~., ~ould require an invest- <br />ment\ cost of :';;36,015,000. Applying the fixed charges <br />cove ing all oosts except fuel, ancl adding the fu.sl coste <br />at v rious prices, produced the annual cost of generating <br />this energy in the substitute steam plant. From these <br />tote. costs, : subtracted the respective costs of gener- <br />atio and transmission by the Joulder and steam systems <br />(excl sive of falling ,.rater) and obtained the annual <br />amoun available for falling ~rater at each price of fuel <br />oil. By dividing each of these annual amounts available <br />for f .lling "rater by 1,647,000,000 k.."-hrs. of primary <br />energ 1 at Boulder Dam, the follo1!ring resul ts ',"ere obtained <br />for t e competitive values of falling .:rater for primary <br />energ in mills per kilo'rratt-hQur at Boulder Dam: <br />COmpetitive Value :of Falling ivater <br />For Primary ~nergy <br />rHlls per K'!!-hr. at Boulder Dam <br />----Sased on Based on------ <br />Fixed Charges per Fixed Charges <br />Jureauof If Privately <br />10'''81' e.nd Lig~ C.'Ined <br /> <br />f Fuel 011 <br />b 1. <br />~2Jl ;:) earn E1.ant 3ff. <br />..r .90 <br />.95 <br />1.00 <br />1.10 <br />Future team Plant ~ff. <br />;? .le <br />1.2C <br /> <br /> <br />Mills uer Kw-Hr. <br />-.787 <br />.$63 <br />.941 <br />1.095 <br />.971 <br />l;1l2 <br /> <br />Mills per Kw-hr. <br />.511 <br />.53$ <br />.665 <br />,$19 <br />.695 <br />.83$ <br /> <br />I <br />I <br /> <br />A. B. Roberts <br /> <br />I <br /> <br /> <br />21. '~ <br />::i <br /> <br />, <br /><~ <br /> <br />;\ <br /> <br />1 <br /> <br />;1 <br />~ <br /> <br />l <br /> <br />i <br />.. <br />'. <br /> <br />I <br />"J <br /> <br />:~ <br /> <br />~ <br />. <br /> <br />l <br />1 <br />