Laserfiche WebLink
<br />o <br />en <br />to <br />I=> <br />o <br />~~ <br /> <br />Water and Salt Budgets <br /> <br />Figures 7 and 8 are computer presentations of the water and salt budgets. <br /> <br />The same method will be used for presentation of post construction measure- <br /> <br />ments and calculations. The budgets will also be used to predict project <br /> <br />benefits (Stage One Development, Grand Valley Unit, D,.finite Plan Report <br /> <br />March 1980). Measured post construction flows and salt loads will be compared <br /> <br />to the predicted values to evaluate project benefits. Statistical and <br /> <br />graphical methods will be used to evaluate the presence and effects of typical <br /> <br />weather Dr water deliveries. ponding tests, measurement of lateral <br /> <br />diversions, revised evapotranspiration potential (ETP), and other pertinent <br /> <br />information will be utilized to gather post construction data. The column <br /> <br />explanations for the water budget are as follows: <br /> <br />Inflow to the study area <br /> <br />Column 1 Government Highline Canal.--The flows "ere calculated from <br />the gaging station operated by the Geological Survey on the <br />the Canal at 16 Road. <br /> <br />CD lumn 2 Grand Valley Kiefer Extension. --The flows were calculated <br />from the gaging station operated by thE: Geological Survey on <br />the canal. <br /> <br />Column 3 Inflow above Highline.--The flows above the Highline Canal <br />were estimated at 10 percent of the precipitation falling on <br />the drainage above the canal. <br /> <br />Column 4 Precipitation.--Records for the study area were extrapolated <br />from National Weather Service data collected at the Grand <br />Junction Airport. <br /> <br />Outflow from the study area <br /> <br />Column 5 Government Highline.--The flows were calculated from the gaging <br />stations operated by the Geological Survey and adjusted by <br />Highline Lake operation study. <br /> <br />Column 6 Grand Valley Kiefer Extension.--The flows were calculated from <br />the gaging stations operated by the Geological Survey. <br /> <br />29 <br />