<br />0025S1 <br /> <br />. <br /> <br />. <br /> <br />Governor Brown told the conferences that the timetable <br />on the State Water Project calls for delivering water to the <br />southern terminous -- Perris Reservoir in Riverside County -- by <br />1972. The first reach of the South Bay Aqueduct will permit <br />delivery of water to Livermore Valley next year. Relocation of <br />Highway 40A and the Western Pacific Railroad around Oroville <br />Reservoir, which has been underway during the past four years, <br />will be completed late in 1962. On August 16, a contract was <br />signed for construction of the first of two tunnels to divert the <br />river during construction and later serve as tailrace for the power <br />plant. The tunnel, scheduled for completion early in 1963, will <br />be 4,333 feet long and 35 feet in diameter, and will cost <br />$6.1 million. Completion of the 735-foot-high dam is scheduled <br />for 1968. Rights of way are being acquired for the San Joaquin <br />Valley-Southern California Aqueduct, and an agreement between <br />the State and Federal Government for joint construction of San Luis <br />Reservoir is under negotiation. Delivery of water in Kern County <br />is scheduled for 1968. <br /> <br />DELTA WATER FACILITIES <br />A preliminary edition of Department of Water Resources <br />Bulletin No. 76, "Delta Water Facilities", has been released for <br />study and comment by interested parties. Alternative plans for <br />transporting Sacramento River system water across the Sacramento- <br />San Joaquin Delta for export and improving conditions in the Delta <br />are presented. <br />The Delta encompasses some 738,000 acres of rich agricul- <br />tural lands, interlaced with 700 miles of meandering waterways. <br /> <br />-2- <br />