My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08952
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08952
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:21 PM
Creation date
10/12/2006 3:22:46 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8449.870
Description
SB 996-153 Phase I - Economic Life of the Denver Basin
State
CO
Basin
South Platte
Date
11/13/1996
Author
CWCB/SEO
Title
Economic Life of the Denver Basin Final Report
Water Supply Pro - Doc Type
Publication
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.... <br /> <br />Mr. Will Burt <br />Page 2 <br />September 25, 1996 <br /> <br />B. Review existing available and verified model software with emphasis on <br />proven reliability, documentation, portability, suitability to the task <br />(especially with regard to stream-aquifer interconnection, so that the <br />aquifer's interaction with the South Platte River can be evaluated), ease <br />of use, and ability to incorporate some or all of the existing SB- 5 <br />model database. This would also include a preliminary assessment of <br />the feasibility of a coupled numeric and spreadsheet or database model <br />that could more effectively and easily allow for modeling various <br />scenarios of economic conditions. <br /> <br />C. Review availability of existing well pumping data, including that <br />available at the State and any that might be obtainable from other <br />entities such as municipalities, Districts, etc. <br /> <br />D. Develop, with your office, a more concise outline of the goals of the <br />economic feasibility study so that the choice and suitability of models <br />can be more appropriately tailored to the task at hand. <br /> <br />E. Based on the above Phase II goals definition, identify the key questions <br />to be resolved by Phase II and work with the State in developing a <br />work plan to conduct the Phase II analyses. Inherent in this task will <br />be development of opinions as to the level of detail and scope that will <br />be likely for Phase II under the currently available $40,000 budget <br />(total Phase I and II) and under extended budget scenarios that may be <br />feasible. This would also include an estimation of the budget required <br />to fully carry out a modeling effort that would be able to thoroughly <br />address all of the goals identified for the Phase n portion, if it later <br />appears that the $40,000 will not be sufficient. <br /> <br />We estimate that our costs to carry out the above scope of work will be approximately <br />$8,500 to $9,500, and would propose setting that higher figure as a not-to-exceed amount. <br />All work would be for actual time and expenses at the rates presented on the enclosed rate <br />schedule. <br />
The URL can be used to link to this page
Your browser does not support the video tag.