My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08945
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08945
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:19 PM
Creation date
10/12/2006 3:22:41 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8030
Description
Section D General Compact Issues - US Water Resources Council
State
CO
Basin
Statewide
Date
12/1/1971
Author
US Water Resources C
Title
Summary - Obers Review Meetings - Held July 1971 - RE-Economic Activity in the US by Water Resources Region and Subarea-Historic and Projected-1929-2020
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
68
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />002922 <br /> <br />Agricultural and Land Use Projections--Concepts and Objectives 1/ <br /> <br />It has been my pleasure and privilege to be associated with the OBERS <br /> <br />program since it was initiated in 1964. The close aSsociation with the <br /> <br />Water Resources Council since its creation has also been rewarding. At <br /> <br />the same time, there have been substantial frustrations in attempting to <br /> <br />deal effectively with a complex problem with so many variables. Substantial <br /> <br />progress has been made since 1964, but much remains to be accomplished. Use <br /> <br />of projections in planning and evaluation is perhaps the most notable case <br /> <br />in point. Meetings such as this must be considered as a.primary source of <br /> <br />ideas for future progress. <br /> <br />Our thoughts concerning the~ricultural and land use projections in <br /> <br />the review report are influenced by many thoughtful comments we have <br /> <br />received, by a desire to make needed adjustments, and by the WRC outlook <br /> <br />for future updating of the OBERS projections--at approximately 5-year inter- <br /> <br />val... <br /> <br />Much of the staff effort over the past few months reflects a concern <br /> <br />to provide materials that do not require adjustment for an extended period of <br /> <br />time. <br /> <br />Appropriate application of the baseline concept of economic projections <br /> <br />in the planning process and the prospect for generating alternative projections <br /> <br />should lessen the need for frequent modifications in the OBERS baselineprojec- <br /> <br />tions. <br /> <br />But this 'does not diininishour desire to achieve useful, high-quality <br /> <br />projections. <br /> <br />In line with theSe thoughts, these regional meetings are <br /> <br />regarded as an eSsential element of the projection process. <br /> <br />The written comments to the Council on the report.have been viewed as <br /> <br />a basic foundation for the,meeting. <br /> <br />We have also received numerous informal <br /> <br />Y Prepared by <br />Economics Division, <br />on the review draft <br /> <br />William A. Green, As..istant Director, Natural Resource <br />ERS, for presentation at the series of regional conferences <br />of the OBERS projections report, July 1971. <br /> <br />I <br /> <br /> <br />~'M~~'- <br /> <br />I~ <br />~(.,..,^, <br />t:r-'-''''.',:-- <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />~~.:~~ <br /> <br /> <br />I <br /> <br />,~~.. <br /> <br />I <br /> <br /> <br />, <br /> <br />~;"ii- ~~;f.1'..; <br />o.r"," , <br />~-:'..~A <br />~:~'i <br /> <br />Il~ <br />~~~~i <br />~/f\~-::- <br />~[{~& <br />~:~:<:7<: <br />,- '~.~ ~,., ".:. <br />)1~1i.~~~: <br />::. ....:0... <br />.~.~ . - -. . <br /> <br />_..--,,'-'. <br />)i::io/.i <br /> <br />:.:,",j..: <br />~~~~:<" <br />~~~~~}~;~-:' <br />
The URL can be used to link to this page
Your browser does not support the video tag.