Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1193 <br /> <br />AMITY MUTUAL IRRIGATION COMPANY <br /> <br />DESCRIPTION OF WORK AND COST ESTIMATE <br /> <br />GREAT PLAINS RESERVOIRS <br /> <br />1. Nee No She Reservoir <br /> <br />Repair and patch outlet structure; replace gates and hoists; <br />excavate spillway, <br /> <br />REPAIR AND PATCH <br />NEW GATES AND HOISTS <br />EXCAVATION <br /> <br />20 CY @ $450 <br />4 EA @ $6000 <br />6000 CY @ $1. 25 <br /> <br />$ 9000 <br />$ 24000 <br />$ 7500 <br /> <br />Subtotal for Nee No She Reservoir: <br /> <br />$ 40500 <br /> <br />2. Nee Skah <Queens> Reservoir <br /> <br />Repair and patch outlet structure; replace gates and hoists; <br />add erosion protection on upstream face; excavate spillway. <br /> <br />REPAIR AND PATCH <br />NEW GATES AND HOISTS <br />EROSION PROTECTION <br />EXCAVATION <br /> <br />30 CY @ $450 <br />3 EA @ $6000 <br />1 EA @ $21000 <br />8000 CY @ $1. 25 <br /> <br />$ 13500 <br />$ 18000 <br />$ 21000 <br />$ 10000 <br /> <br />Subtotal for Nee Skah <Queens) Reservoir: <br /> <br />$ 62500 <br /> <br />TOTAL FOR GREAT PLAINS RESERVOIRS: $ 103000 <br /> <br />A-13 <br />