Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1192 <br />AMI,Y MUTUAL IRRIGATION COMPANY <br /> <br />DESCRIPTION OF WORK AND COST ESTIMATE <br /> <br />KICKING BIRD CANAL <br /> <br />1. No.2 Bifurcation Structure(mile 36.5) <br /> <br />Rehabilitate; repair and patch structure; replace gates, <br /> <br />REMOVE CONCRETE <br />REPAIR AND PATCH <br />NEW GATES AND HOISTS <br /> <br />1 EA @ $3000 <br />80 CY @ $450 <br />5 EA @ $12500 <br /> <br />$ 3000 <br />$ 36000 <br />$ 62500 <br /> <br />Subtotal for No. 2 Bifurcation Structure: <br /> <br />$ 101500 <br /> <br />TOTAL FOR KICKING BIRD CANAL: $ 101500 <br /> <br />A-12 <br />