Laserfiche WebLink
<br />, ' <br />AMITV MUTUAL IRRIGATION COMPANY <br /> <br />DESCRIPTION OF WORK AND COST ESTIMATE <br /> <br />AM I TY CANALlContinuedl <br /> <br />3. Wiley Drain Spillwaylmile 3.8) <br /> <br />Construct check structure and dike; <br />exavate spillway, <br /> <br /> EXCAVATION 150 CY @ $3.50 $ 525 <br /> COMPACTED BACKFILL 120 CY @ $7,00 $ 840 <br /> STRUCTURAL CONCRETE 220 CY @ $325 $ 71500 <br /> BORROW AND HAUL 10000 CY @ $2.00 $ 20000 <br /> COMPACTED EMBANKMENT 10000 CY @ $1. 00 $ 10000 <br /> NEW GATES AND HOISTS 1 EA @ $20000 $ 20000 <br /> ------- <br /> Subtotal for Wil ey Drain Sp i 11 way: <br />4. May Valley Wastewaylmile 10.7) <br /> <br />Replace gate and hoist;construct bridge across structure, <br /> <br />NEW GATES AND HOISTS <br />STRUCTURAL CONCRETE <br /> <br />1 EA @ $10000 <br />15 CY @ $325 <br /> <br />$ 10000 <br />$ 4875 <br /> <br />Subtotal for May Valley Wasteway: <br /> <br />5. Nevius Drop Structurelmile 19.3) <br /> <br />Add erosion protection downstream, <br /> <br />EROSION PROTECTION <br /> <br />1 EA 1:1! $5000 <br /> <br />$ 5000 <br /> <br />Subtotal for Nevius Drop Structure: <br /> <br />6. Big Sandy Creek Wasteway and CheckCmile 29,6) <br /> <br />Replace superstructure; gates and hoists; add erosion <br /> <br />REMOVE CONCRETE 1 EA @ $12000 $ 12000 <br />STRUCTURAL CONCRETE 200 CY @ $325 $ 65000 <br />NEW GATES AND HOISTS 5 EA @ $10000 $ 50000 <br />EROSION PROTECTION 1 EA @ $2500 $ 2500 <br /> ------- <br />Subtotal for Big Sandy Creek Wasteway and Check: <br /> <br />A-3 <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />$ 122865 I <br /> <br />I <br />I <br /> <br />$ 14875 I <br /> <br />I <br />I <br />$ 5000 <br /> <br />I <br /> <br />protection, <br /> <br />I <br />I <br /> <br />$ 129500 I <br /> <br />I <br />I <br />