My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08894
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08894
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:04 PM
Creation date
10/12/2006 3:20:14 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8135.100
Description
Ditch Companies - Amity Mutual Irrigation Company
State
CO
Basin
Arkansas
Water Division
2
Date
6/1/1983
Author
McCall-Ellingson Mor
Title
PL 84-984 Loan Application Report for the Amity Mutual Irrigation Company - Rehabilitation Plan-Amity System
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />1186 <br />AMITY MUTUAL IRRIGATION COMPANY <br /> <br />DESCRIPTION OF WORK AND COST ESTIMATE <br /> <br />AMITY CANAL <br /> <br />1. Arkansas River Diversion!mile 0.01 <br /> <br />a, Headworks <br /> <br />Replace gates and operating deck. <br /> <br />REMOVE DECK 1 EA @ $2000 $ 2000 <br />NEW DECK 1 EA @ $6000 $ 6000 <br />NEW GATES AND HOISTS 8 EA @ $3900 $ 31200 <br /> ------- <br /> Subtotal: $ 39200 <br /> <br />b. Sluiceway <br />Paint tWD sluiceway gates. <br /> <br />PAINT GATES <br /> <br />2 EA @ $6000 $ 12000 <br />------- <br />Subtotal: $ 12000 <br /> <br />c, Access Bridge <br /> <br />Replace bridge. <br />REPLACE BRIDGE 300 SF @ $10,00 $ 3000 <br />------- <br />Subtotal: $ 3000 <br />Subtotal for Arkansas River Diversion: $ <br />2, River Return; Wasteway and Check!mile 0,61 <br />Replace wasteway and gates; remove check structure. <br /> <br />54200 <br /> <br />REMOVE CONCRETE 1 EA @ $5000 $ 5000 <br />EXCAVATION 200 CY @ $3,50 $ 700 <br />COMPACTED BACKFILL 200 CY @ $7,00 $ 1400 <br />STRUCTURAL CONCRETE 300 CY @ $325 $ 97500 <br />NEi'J GATES AND HOISTS 2 EA @ $12000 $ 24000 <br /> ------- <br />Subtotal for River Return; Wasteway and Check: $ 128600 <br /> <br />A-2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.