My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WSP08894
CWCB
>
Water Supply Protection
>
Backfile
>
8001-9000
>
WSP08894
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/26/2010 2:50:04 PM
Creation date
10/12/2006 3:20:14 AM
Metadata
Fields
Template:
Water Supply Protection
File Number
8135.100
Description
Ditch Companies - Amity Mutual Irrigation Company
State
CO
Basin
Arkansas
Water Division
2
Date
6/1/1983
Author
McCall-Ellingson Mor
Title
PL 84-984 Loan Application Report for the Amity Mutual Irrigation Company - Rehabilitation Plan-Amity System
Water Supply Pro - Doc Type
Report/Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4-4 <br /> <br />~ <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />rehabilitation plan to be done by them consist of the follO\'Jing improve- <br />ments: Core wall* for seepage control and stability and silt removal <br />at critical improvements. They have. by construction contract, repaired <br />the Siphon transiLion Oil the Big Sandy Creek Siphon, rehabilitated the <br />diversion dam sluiceway and headworks and constructed a measuring flume <br />in the Kicking Bird Canal. <br /> <br />COMPLIANCE WITH EXECUTIVE ORDERS <br /> <br />Executive Order 11988 (replaced by Executive Order 11296) - Flood Plain <br />Management. sets pol icy to avoi d adverse impacts associ ated \1ith work in <br />floodrlains. The proposed prOject will lessen the risk of losses due to <br />floods, Flood hazards v/ill be evaluated and the project will be designed <br />to v/ithstand flood hazards. Additional expenditures by the Federal <br />government after construction will not be requil-ed for additional flood <br />protecti on. Therefol'e, the proposed project is in comp 1 i ance with <br />Executive Order 11988. <br /> <br />Executive Order 1199D - Protection of Wetlands. stresses the need to <br />avoid adverse impacts of construction activities in wetlands. The only <br />identified wetlands which vlill be encountered are at Bid Sandy Creek and <br />at Buffalo Creek. In these instances. the construction specifications <br />will direct that specific measures be implemented to minimize adverse <br />construction impacts in these areas. as agreed with the Fish and Wildlife <br />Service. These measures assure compliance with Executive Order 11990. <br /> <br />*Core \-Iall is constructed by trenching an 8-inch I-ride by 8-foot deep <br />trench in the canal dike and filling the trench with concrete. <br />
The URL can be used to link to this page
Your browser does not support the video tag.