Laserfiche WebLink
<br /> <br />C,n?r~!n <br />.....J"-" o-t ,) <br /> <br />TABLE 11 <br />ESTIMATE OF COST (PLAN I) <br /> <br />First Cost: <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />Lands <br />Dams <br />Relocations <br />Pumping Plants <br />Canals <br />Siphons <br />Automation/Communication <br />Wildlife Mitigation <br />Cultural Resources <br /> <br />Subtotal First Cost <br /> <br />$ 228,000,000 <br />69,000,000 <br />166,000,000 <br />984,000,000 <br />1,107,000,000 <br />10,000,000 <br />12,000,000 <br />284,000,000 <br />26,000,000 <br /> <br />$2,886,000,000 <br /> <br />159,000,000 <br />133,000,000 <br /> <br />$3,178,000,000 <br /> <br />Engineering & Design (6%) <br />Supervision & Administration (5%) <br />Total First Cost <br /> <br />Operations, Maintenance, Major Replacements: <br /> <br />Total O,M&R <br /> <br />$1,000,000 <br />3,000,000 <br />6,000,000 <br /> <br />$10,000,000 <br /> <br />Oams <br />Pumping Plants <br />Can a 1 s <br /> <br />Interest During Construction (IOC): <br /> <br />IOC = (First Cost - Lands)/Constr. Period) x (F/A, 7-3/8, 15)] - <br />[first Cost - Lands] <br />= (($2,950,000,000/15 yrs) x 25.8669] - $2,950,000,000 <br />= $2,137,000,000 <br /> <br />Annual Cost (AC): <br /> <br />AC = [(First Cost + IDC) x (A/P, 7-3/8, 100)] + O,M&R + Energy/Yr <br />= [($3,178,000,000 + 2,137,000,000) x (0.07380995)] <br />+10,000,000 + 174,000,000 = $576,000,000 <br /> <br />023 <br />