Laserfiche WebLink
<br />U' f' ")" '? <br />.. ,,- ) 't . <br />'v L.J l ...l <br /> <br />PLAN I AND PLAN II <br /> <br />Plan I and Plan II are essentially the same type water transfer <br />investigations. Both plans are for the movement of transfer water from <br />central and western Arkansas and eastern Texas to a suitable terminal <br />storage facility in western Texas. Plan I meets the requirement for <br />restoration of the Ogallala Aquifer at its current level of use. <br />Plan II meets the requirement for the maximum estimated water available <br />for diversion above the estimated base flow. Plan I utilizes <br />1.55 million acre-feet while Plan II utilizes 8.7 million acre-feet. <br />These plans are discussed in greater detail in the Project Formulation <br />(Transfer Plans) section and are shown on Figures 8 and 9. <br /> <br />SELECTED PLAN <br /> <br />GENERAL <br /> <br />The purpose of this report is not to select a particular plan but <br />to present reconnaissance level information which, when coupled with <br />comparable data on other water transfer routes, can be analyzed and a <br />recommendation prepared. This assembly and review of information will <br />be accomplished by Southwestern Division in Dallas. <br /> <br />PROJECT FORMULATION (TRANSFER PLANS) <br /> <br />GENERAL <br /> <br />This section addresses the proposed water sources, water transport <br />systems and a tentatively selected terminal storage facility for the <br />collection and transferring of water along a corridor through central <br />and western Arkansas and northern Texas to a tentatively selected site <br />for distribution. <br /> <br />The proposed water source subsection includes the initial <br />collection, pumping and temporary storage for each site. The water <br />transport systems include pumping plants and conveyance systems for the <br />movement of transfer water to a major terminal storage site. The <br />terminal facilities include the major storage facility and location for <br />the primary distribution intake. This facility does not include a <br />distribution network nor the primary intake for such a system. <br /> <br />09 <br />